![Mitsubishi Electric NZ2GF-CCB Скачать руководство пользователя страница 45](http://html.mh-extra.com/html/mitsubishi-electric/nz2gf-ccb/nz2gf-ccb_user-manual_1811813045.webp)
43
CHAPTER 6 INSTALLATION AND WIRING
6
6.
3 I
ns
tallat
ion
(2) Removal procedure
(3) Applicable DIN rail model (compliant with IEC 60715)
• TH35-7.5Fe
• TH35-7.5Al
(4) Interval between DIN rail mounting screws
Tighten the screws at intervals of 200mm or less.
(5) DIN rail stopper
Use a stopper that is attachable to a DIN rail.
1.
Remove the DIN rail stopper.
Remove the module in the reverse manner of (1).
2.
Remove the module from the DIN rail by pulling the
lower part of the module closer while pushing down
the DIN rail hook with a slotted screwdriver.
Содержание NZ2GF-CCB
Страница 1: ...CC Link IE Field Network CC Link Bridge Module User s Manual NZ2GF CCB ...
Страница 2: ......
Страница 9: ...7 Memo ...
Страница 35: ...33 CHAPTER 4 THE PROCEDURE BEFORE OPERATION 4 Memo ...
Страница 143: ...141 APPENDICES A Appendix 7 External Dimensions Appendix 7 External Dimensions 160 65 4 5 68 9 2 Unit mm ...
Страница 145: ...I 4 4 7 8 143 Memo ...
Страница 149: ......