37
B Check of open phase
MUZ-GC25/35NA MUZ-GC50NA-
C2
●
With the connector between the compressor and the intelligent power module disconnected, activate the inverter and check if
the inverter is normal by measuring the balance of voltage between the terminals.
Output voltage is 50 - 130 V. (The voltage may differ according to the tester.)
<< Operation method>>
Start cooling or heating operation by pressing EMERGENCY OPERATION switch on the indoor unit. (TEST RUN OPERA-
TION : Refer to 6-3.)
<<Measurement point>>
At 3 points
BLK (U)-WHT (V)
BLK (U)-RED (W)
WHT(V)-RED (W)
NOTE
: 1. Output voltage varies according to power supply voltage.
2. Measure the voltage by analog type tester.
3. During this check, LED of inverter P.C. board
fl
ashes 9 times. (Refer to 9-6.1.)
Measure AC voltage between the
lead wires at 3 points.
C Check of compressor
MUZ-GC25/35NA MUZ-GC50NA-
C2
Refer to 9-5. “Check of compressor
operation time”. Does the compressor
operate continuously?
OK.
No
Yes
Refer to 9-5. “Check of compressor
winding”. Is the compressor normal?
Replace the compressor.
No
Yes
Refer to 9-5. "Check of compressor start failure".
MUZ-GC25/35NA
●
Disconnect the connector (CN61) between the compressor and intelligent power module, and measure the resistance be-
tween the compressor terminals.
<<Measurement point>>
At 3 points
BLK-WHT
BLK-RED
WHT-RED
<<Judgement>>
Refer to 9-4.
0[
Ω
] ················Abnormal [short]
Infinite[
Ω
] ·······Abnormal [open]
NOTE
: Be sure to zero the ohmmeter before measurement.
Measure the resistance between the lead wires at 3 points.
D Check of compressor winding
Содержание Mr.Slim MUZ-GC25NA - C1
Страница 9: ...9 MUZ GC25NA MUZ GC35NA 4 WIRING DIAGRAM ...
Страница 10: ...10 MUZ GC50NA C1 MUZ GC60NA C1 ...
Страница 11: ...11 MUZ GC50NA C2 ...
Страница 12: ...12 MUZ GC60NA C2 ...
Страница 13: ...13 MUZ GC71NA ...
Страница 61: ...61 ...
Страница 62: ...62 ...
Страница 63: ...63 ...