38
E Check of compressor operation time
MUZ-GC25/35NA MUZ-GC50NA-
C2
●
Connect the compressor and activate the inverter. Then
measure the time until the inverter stops due to over current.
<<Operation method>>
Start heating or cooling operation by pressing EMERGENCY
OPERATION switch on the indoor unit.
(TEST RUN OPERATION : Refer to 6-3.)
<<Measurement>>
Measure the time from the start of outdoor fan running to the
stop of compressor due to overcurrent.
Compressor starts
Abnormal
(IPM failure)
(Compressor winding short)
Abnormal
(Compressor lock out)
(Starting defect)
Abnormal
(Poor contact,)
(Outdoor P.C. board defect)
(Disconnected connector)
Abnormal
(Refrigerant circuit defect)
(Closed valve)
Normal
0 second
1 second
2 seconds
10 seconds
10 minutes
<<Judgement>>
F Check of compressor start failure
After the compressor is heated with a drier,
does the compressor start? 1
Replace the compressor.
Compressor start failure. Activate pre-heat control.
(Refer to 8-2. "PRE-HEAT CONTROL SETTING")
No
Yes
Does the compressor run for 10 seconds or
more after it starts?
Check the refrigerant circuit.
Check the stop valve.
Yes
No
1
Heat the compressor with
a drier for about 20 minutes.
Do not recover refrigerant
gas while heating.
Heating part
Con
fi
rm that 1~4 is normal.
•Electrical circuit check
Contact of the compressor connector (including CN61)
Output voltage of inverter P.C. board and balance of them (See 9-5. )
Direct current voltage between DB61(+) and (-) on the inverter P.C.board
Voltage between outdoor terminal block S1-S2
1.
2.
3.
4.
MUZ-GC25/35NA MUZ-GC50NA-
C2
Содержание Mr.Slim MUZ-GC25NA - C1
Страница 9: ...9 MUZ GC25NA MUZ GC35NA 4 WIRING DIAGRAM ...
Страница 10: ...10 MUZ GC50NA C1 MUZ GC60NA C1 ...
Страница 11: ...11 MUZ GC50NA C2 ...
Страница 12: ...12 MUZ GC60NA C2 ...
Страница 13: ...13 MUZ GC71NA ...
Страница 61: ...61 ...
Страница 62: ...62 ...
Страница 63: ...63 ...