60
OPERATING PROCEDURE
PHOTOS
7. Removing the compressor and 4-way valve
(1) Remove the top panel, cabinet and service panel. (Refer to
1.)
(2) Remove the back panel. (Refer to 1.)
(3) Remove the inverter assembly. (Refer to 2.)
(4) Recover gas from the refrigerant circuit.
NOTE:
Recover gas from the pipes until the pressure gauge
shows 0 kg/cm
2
(0 MPa).
(5) Detach the welded part of the suction and the discharge
pipe connected with compressor. (Photo 11)
(6) Remove the compressor nuts.
(7) Remove the compressor.
(8) Detach the welded part of 4-way valve and pipe. (Photo 10)
Photo 10
Photo 11
8. Removing the reactor
(1) Remove the top panel, cabinet, service panel and the back
panel. (Refer to 1.)
(2) Disconnect the reactor lead wire.
(3) Remove the screws of the reactor, and remove the reactor.
(Photo 5,12)
Photo 12 (
MUZ-GC50NA-
C1
MUZ-GC60/71
)
Welded parts of 4-way valve
Welded part
of the dis-
charge pipe
R.V. coil
Welded part
of the suction
pipe
Screws of the reactor
Содержание Mr.Slim MUZ-GC25NA - C1
Страница 9: ...9 MUZ GC25NA MUZ GC35NA 4 WIRING DIAGRAM ...
Страница 10: ...10 MUZ GC50NA C1 MUZ GC60NA C1 ...
Страница 11: ...11 MUZ GC50NA C2 ...
Страница 12: ...12 MUZ GC60NA C2 ...
Страница 13: ...13 MUZ GC71NA ...
Страница 61: ...61 ...
Страница 62: ...62 ...
Страница 63: ...63 ...