2-12
Installation
2Unpacking to Installation
(3) RV-4FR/7FR/13FR series
Fig.2-3 : Unpacking the robot arm (RV-4FR/7FR/13FR series)
The robot is shipped from the factory in cardboard and plywood packing. Always refer to
and unpack the
robot.
Handle the robot arm according to
"2.2.3Transportation procedures (Transporting with a crane)"
.
Always unpack the robot at a flat place. The robot could tilt over if unpacked at an
unstable place.
The unpacking process is shown below.
1) Using a knife, etc., slit the tape <1> fixing the upper lid <2> of the cardboard box. (
)
2) Pull the upper lid <2> of the cardboard box off with both hands. (
)
3) Remove the hexagon socket bolts <3> (four positions) connecting the sleeper and the base unit. (
(c)
)
4) Unpacking is completed.
②上ブタ
(a)
(b)
(c)
引き抜く
①テープ
フォークリフトの爪
挿入口
ロボット本体
!
CAUTION
!
Always unpack the
robot at a flat place.
The robot could tilt
over if unpacked at an
unstable place.
Pull off
<2> Upper lid
<1> Tape
The fork insertion
slots for a forklift truck
Robot arm
Note) Although the figure is the example of RV-4FR, other types are
the same also.
CAUTION