The most appropriate command to use in this application is the MELSEC ‘PLS’ (Rising edge
Pulse). It has been adopted here instead of the IEC instruction R_TRIG (Rising edge Trigger)
instruction, which would also be suitable.
The following diagram illustrates the order of sequencing of the carousel control. Note that the
rising edge of the foot switch triggers the motor ON, irrespective of the “In Position” sensor being
ON.
When the table begins rotating, the “In position” sensor turns OFF a little later. The motor contin-
ues to drive the carousel conveyer until the rising edge of the “In Position” sensor is detected;
this turns the motor OFF. Note that the foot switch continues to be held on.
The Motor can only start rotation when the foot switch is released and subsequently reactivated.
Hence the motor starts again on the rising edge of the Foot Switch being operated.
Timing Diagram of Carousel Control Logic:
Building a Project
Application Program
Training Manual GX IEC Developer
4 - 5
Foot Switch
In Position
Motor
Foot switch
Motor
In position
Содержание FX2N-32CAN
Страница 1: ...MITSUBISHI ELECTRIC FACTORY AUTOMATION Programmable Logic Controllers GX IEC Developer ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ...IV MITSUBISHI ELECTRIC ...
Страница 18: ...Modular PLC Training Hardware Course Overview and Requirements 1 2 MITSUBISHI ELECTRIC ...
Страница 172: ...Monitoring Instances of Function Blocks Advanced Monitoring Functions 7 12 MITSUBISHI ELECTRIC ...
Страница 176: ...Device Edit 8 4 MITSUBISHI ELECTRIC ...
Страница 190: ...Assigning DUT Variables to Function Blocks Data Unit Types DUT 10 10 MITSUBISHI ELECTRIC ...
Страница 198: ...Array Example Single Dimension Array Arrays 11 8 MITSUBISHI ELECTRIC ...
Страница 219: ...Sequential Function Chart SFC SFC Elements Training Manual GX IEC Developer 14 3 ...
Страница 220: ...14 3 SFC configuration examples SFC configuration examples Sequential Function Chart SFC 14 4 MITSUBISHI ELECTRIC ...
Страница 230: ...Structured Text Program Example IEC Structured Text 16 4 MITSUBISHI ELECTRIC ...
Страница 248: ...Configuring GX IEC Developer to access the PLC on Ethernet Ethernet Communications 18 10 MITSUBISHI ELECTRIC ...
Страница 278: ...PLC Components Glossary Appendix A 18 MITSUBISHI ELECTRIC ...
Страница 283: ......