햴
Finally, enter the following network as shown:
Checking the entered Program
When the three networks have been entered, complete click the Check
button and if all is
well, the following dialogue is displayed:
Adding new POU’s – Counters and Timers
Continuing with the Carousel example; Additional routines will now be added to illustrate the use
of timing and counting functions.
–
Counting number of operations (Product Batch Counter)
–
Create an additional POU to provide a batch counting function.
Task:
An additional POU will now be added to the project in order to count the number of times the
motor is activated, i.e. product batch counter.
When ten products have been counted, the PLC will flash an output at a 1 Second ‘time-base’
until a button is operated to reset the batch counter.
Enter the following POU ladder routine, using the ‘free-form’ editors as shown:
햲
Create a new POU by clicking on the
button.
Building a Project
Application Program
Training Manual GX IEC Developer
4 - 23
Содержание FX2N-32CAN
Страница 1: ...MITSUBISHI ELECTRIC FACTORY AUTOMATION Programmable Logic Controllers GX IEC Developer ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ...IV MITSUBISHI ELECTRIC ...
Страница 18: ...Modular PLC Training Hardware Course Overview and Requirements 1 2 MITSUBISHI ELECTRIC ...
Страница 172: ...Monitoring Instances of Function Blocks Advanced Monitoring Functions 7 12 MITSUBISHI ELECTRIC ...
Страница 176: ...Device Edit 8 4 MITSUBISHI ELECTRIC ...
Страница 190: ...Assigning DUT Variables to Function Blocks Data Unit Types DUT 10 10 MITSUBISHI ELECTRIC ...
Страница 198: ...Array Example Single Dimension Array Arrays 11 8 MITSUBISHI ELECTRIC ...
Страница 219: ...Sequential Function Chart SFC SFC Elements Training Manual GX IEC Developer 14 3 ...
Страница 220: ...14 3 SFC configuration examples SFC configuration examples Sequential Function Chart SFC 14 4 MITSUBISHI ELECTRIC ...
Страница 230: ...Structured Text Program Example IEC Structured Text 16 4 MITSUBISHI ELECTRIC ...
Страница 248: ...Configuring GX IEC Developer to access the PLC on Ethernet Ethernet Communications 18 10 MITSUBISHI ELECTRIC ...
Страница 278: ...PLC Components Glossary Appendix A 18 MITSUBISHI ELECTRIC ...
Страница 283: ......