Inspection item
156
PRECAUTIONS FOR MAINTENANCE AND INSPECTION
Oil component of the heat dissipation grease used inside the converter unit may leak out. The oil component, however, is not flammable,
corrosive, nor conductive and is not harmful to humans. Wipe off such oil component.
It is recommended to install a voltage monitoring device for checking the voltage of the power supplied to the converter unit.
One to two years of periodic inspection cycle is recommended. However, it differs according to the installation environment.
Consult us for periodic inspection.
NOTE
• Continuous use of a leaked, deformed, or degraded smoothing aluminum electrolytic capacitor (as shown in the table above)
may lead to a burst, breakage or fire. Replace such capacitor without delay.
Display
Indication
(1) Check that display is normal.
Contact the
manufacturer.
(2) Check for stain.
Clean.
Meter
Check that reading is normal.
Stop the equipment
and contact the
manufacturer.
Load
motor
Operation check
Check for vibration and abnormal increase in
operation noise.
Stop the equipment
and contact the
manufacturer.
Area of
inspection
Inspection
item
Description
Inspection
interval
Corrective action
at fault
occurrence
Check by
the user
Daily
Periodic
Содержание FR-CC2-P
Страница 59: ...MEMO 58 ...
Страница 73: ...MEMO 72 ...
Страница 137: ...MEMO 136 ...
Страница 153: ...MEMO 152 ...
Страница 165: ...MEMO 164 ...
Страница 169: ...MEMO 168 ...