![Mitsubishi Electric AE-200A Скачать руководство пользователя страница 73](http://html.mh-extra.com/html/mitsubishi-electric/ae-200a/ae-200a_instruction-book_1810107073.webp)
73
WT07996X02
2-3-3. Annual Schedule
Schedules can be set for public holidays or summer vacation.
Up to five operation patterns (Pattern 1 to 5) can be set for the 24 months including the current month, and total of
50 days can be allocated to the patterns.
[1] Selecting a target to which the schedule will be applied
(1) In the Floor Layout screen or group list, select a group icon(s) to which the schedule will be applied.
Refer to [1] in 2-3-2 “Weekly Schedule” for details.
[2] Selecting a schedule pattern
Up to five operation patterns can be set.
(1) In the Schedule settings screen (Month or Week display), click [Annual schedule pattern].
(2) In the pattern settings screen, select a schedule pattern to set the schedule.
(3) An Edit schedule settings screen will appear.
[3] Creating or changing the schedule contents
(1) In the Edit schedule settings screen, set the start time to apply to the schedule, set the operations to be
scheduled, and then click [OK].
Refer to [4] in 2-3-2 “Weekly Schedule” for details.
Schedule Setting (Month)
Pattern settings
Edit schedule settings (Pattern)
Annual schedule pattern
Display switching
Switches between
Month and Week.
Pattern selection
Select a pattern to
set the schedule.
Schedule
contents
Pattern to set the schedule
Simplified display
The simple schedule
contents for each
pattern will appear.
Simplified display
The simple schedule contents
for each pattern will appear.
For building managers
Chapter 2