![Mitsubishi Electric AE-200A Скачать руководство пользователя страница 64](http://html.mh-extra.com/html/mitsubishi-electric/ae-200a/ae-200a_instruction-book_1810107064.webp)
64
WT07996X02
2-2-4. Peak Cut
The Peak Cut screen displays the average electric power consumption (30 minutes (demand value)) graph for each
centralized controller, and the Peak Cut control level (0 to 4) graph.
Confirmation of daily energy-saving status through shifts in demand values, maximum values, and shifts in control
levels is possible. Additionally, by looking at Peak Cut control status, adjustment of control level settings values
(electric power) is possible.
Click [Energy Mgmt] in the menu, and then click [Peak Cut] to access the Peak Cut screen.
Note: A separate license is required to use the Peak Cut control.
Note: Peak Cut control settings are configured in the initial settings. Refer to the Instruction Book (Initial Settings) for settings
methods.
Note: Average electric power consumption is based on the electric power consumed in 30-minute period (the first 30 minutes and
the last 30 minutes of each hour) in the past.
(1) In the [Controller] section, select a centralized controller to display a Peak Cut control status graph.
The measurement data of the specified measurement date will appear.
Item
Description
Controller
Select a centralized controller.
Measurement
date
Click to display the date selection screen, and select the measurement date.
Note: The data of the past 25 months including the current day can be displayed.
Controller
Measurement date
Measurement unit/scale
of average electric power
Average electric power
(bar graph)
Control level (line graph)
Control level scale
Download
Time