![Mitsubishi Electric AE-200A Скачать руководство пользователя страница 140](http://html.mh-extra.com/html/mitsubishi-electric/ae-200a/ae-200a_instruction-book_1810107140.webp)
140
WT07996X02
[2] Checking the date range for each schedule
Five types of weekly schedule date range settings (Weekly 1 to 5) that have been set on the Integrated Centralized
Control Web can be checked.
(1) In the Schedule settings screen (Month or Week display), click [Weekly schedule].
(2) Clicking [Weekly 1–5] will display the date ranges in which each weekly schedule will be effective.
Note: Only building managers can configure the weekly schedule date range setting. Tenant managers cannot configure the setting.
Note: The date range settings are set for each centralized controller (AE-200/AE-50/EW-50).
[3] Selecting a day of the week
Schedules can be set for each day of the week for each weekly schedule (Weekly 1 to 5).
(1) In the Schedule settings screen, select one of the weekly schedule (Weekly 1 to 5).
(2) Click the day to set the schedule.
A screen to edit the schedules of the selected weekly schedule and the selected day of the week will
appear.
Weekly schedule
Schedule settings (Month)
Weekly schedule
Display switching
Switches between
Month and Week.
Date range
Schedule Setting (Week)
Weekly schedule
Display switching
Switches between
Month and Week.
Weekly 1–5
Weekly schedule
Edit schedule settings
Weekly 1–5
Select the weekly
schedule to set the
schedule.
Day-of-the-week
selection
Select the day to
set the schedule.
Simplified display
The simple schedule contents for
each day of the week will appear.
Day of the week
The selected day
of the week will
appear.
Schedule contents
Simplified display
The simple schedule contents will
appear.
Weekly 1–5
The
selected
weekly
schedule
will appear.