![Mitsubishi Electric AE-200A Скачать руководство пользователя страница 139](http://html.mh-extra.com/html/mitsubishi-electric/ae-200a/ae-200a_instruction-book_1810107139.webp)
139
WT07996X02
1-3-2. Weekly Schedule
Five types of weekly schedules (Weekly 1 to 5) can be set. Operations can be scheduled for each day of the week
for each weekly schedule.
[1] Selecting a target to which the schedule will be applied
In the group list, select a group icon(s) to which the schedule will be applied, and click [Schedule settings]. A screen
to set a schedule for the selected group(s) will appear.
(1) Select [HWHP] to set the schedule for HWHP (CAHV, CRHV) units, or select [Show groups] to set the
schedule for other equipment.
(2) Select a group icon(s) to which the schedule will be
applied, and click [Schedule settings] in the taskbar.
(3) If different equipment types exist together, a screen
to select an equipment type will appear.
Select one of the equipment types to set the
schedule.
(4) Select a setting method.
(A) To create a new schedule or to edit an existing schedule, click [Edit schedule contents] and click [OK].
(B) To create a schedule based on the existing setting of other group, select [Create based on other group],
select the group whose schedule is to be based on, and click [OK]. The contents of the schedule that
have been set for the selected group will appear on the screen that will appear next.
Note: If the group whose schedule is to be based on has no schedule settings, no contents of the schedule will appear on the
screen that will appear next.
Group list
Schedule settings
Schedule settings
(A) Creating newly or editing
(B) Creating based on the setting of other group
Edit schedule contents
Create based on other
group
Select the group whose
schedule is to be based
on.
For tenant managers
Chapter 3