![Minebea Intec PR 5230 Скачать руководство пользователя страница 216](http://html1.mh-extra.com/html/minebea-intec/pr-5230/pr-5230_instrument-manual_1801221216.webp)
1.
Select [Show Pendeo data] and confirm.
[Zero correction]
(zero point correction)
The zero point correction in use is displayed.
[Communication error count]
(communication error counter)
The communication errors (time frames exceeded) for the load cells are counted
here in ascending order and displayed.
[LC 1…n]
Bar graph display
The bar graph shows three areas:
A
dead load (can be changed by calibration)
B
Maximum capacity E
max
(max. capacity of load cell) including dead load (load cell,
cannot be changed)
An info window opens.
7 Commissioning
Transmitter in field housing PR 5230
EN-213
Minebea Intec