![Miller Ag-Bag G6170 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/miller/ag-bag-g6170/ag-bag-g6170_operators-manual_1796047036.webp)
30
CAUTION
Caution should be used when moving bags. Weight of bags can be over 400
pounds depending on size of bag.
5. Unfold the bag, lift the top half of the bag and place it on the bag cradle. Using the winch on
the bag boom, raise the bag up. Once the bag is raised, rotate the bag so the stretch measure
marks are between 1 and 3 o’clock.
NOTE:
Do Not roll the bag while placing on the tunnel. Keep the f
olds flat. Bag damage could occur
if bag is not flat.
6. Crank the bag boom winch up until the cradle is above the tunnel. Swing the boom and cradle
toward the tunnel. Carefully work the bag around the tunnel, making sure the bag maintains its
flat look and is flat between the tunnel and the bag pan.
7. Lower the cradle until it is resting on top of the tunnel. Make sure the cradle is on the tunnel and
not on the tunnel extension. The cradle should rest between the two pipes on the top of the tun-
nel. Once the cradle is in place on the tunnel remove all the ties that hold the bag folds together.
IMPORTANT: To avoid damage to the bag during operation and set up, be sure the lifting loop
on the top of the tunnel extension is laying flat against the tunnel.
Bag Cradle In Correct
Position On Top Of Tun-
nel (Bag Not Shown For
Clarity)
Lifting Loop On
Tunnel Extension
Pipes On
Tunnel
Содержание Ag-Bag G6170
Страница 5: ...3 This Page Intentionally Left Blank...
Страница 93: ...87 This Page Intentionally Left Blank...
Страница 94: ...88 This Page Intentionally Left Blank...
Страница 96: ...2013 by Miller St Nazianz Inc...