Contents
1. Maintenance ........................................................................................................22
1.1
First Time Installation Check ........................................................................22
1.2
Refrigerant Recharge ...................................................................................24
1.3 Re-Installation
.............................................................................................25
1.3.1
Indoor Unit ..................................................................................25
1.3.2
Outdoor Unit ...............................................................................27
2. Disassembly .........................................................................................................29
2.1
Indoor Unit ..................................................................................................29
2.2
Outdoor Unit ...............................................................................................46
Maintenance and Disassembly
Содержание MISSION2 3D INVERTER Series
Страница 1: ...MISSION2 3D INVERTER SERIES SM_MISSION2 GA _60R410A_3D INVERTER_US_NA_171121 2017 SERVICE MANUAL...
Страница 2: ......
Страница 4: ......
Страница 11: ...Specifications Page 7 MOB01 09HFN1 MW0W MOB01 12HFN1 MV0W MOCA01 18HFN1 MT0W...
Страница 12: ...Specifications Page 8 MOD01 23HFN1 MT0W...
Страница 15: ...Specifications Page 11 PCB board of MOD01 23HFN1 MT0W...
Страница 16: ...Specifications Page 12 IPM board of MOD01 23HFN1 MT0W...
Страница 101: ...Troubleshooting Page 97 Remark Measure the DC voltage between P and N port The normal value should be around 310V...