Maintenance and
Disassembly
Page 27
1.3.2 Outdoor Unit
Evacuation for the whole system
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
56+4
)259+
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
5VKT
5VKT
2U
.O
<GI[[SV[SV
Procedure:
1.
Confirm that the 2- and 3-way valves are opened.
2.
Connect the vacuum pump to the 3-way valve’s
service port.
3.
Evacuate the system for approximately one hour.
Confirm that the compound meter indicates
-0.1 MPa (14.5Psi).
4.
Close the valve (Low side) on the charge set and turn
off the vacuum pump.
Wait for five minutes then check whether the gauge
needle moves after turning off the vacuum pump. If
the gauge needle moves backward, check whether
there is gas leakage.
5.
Disconnect the charge hose from the vacuum pump.
6.
Mount the caps of service port and 2- and 3-way
valves.
7.
Use a torque wrench to tighten the caps to a torque
of 18N.m.
Содержание MISSION2 3D INVERTER Series
Страница 1: ...MISSION2 3D INVERTER SERIES SM_MISSION2 GA _60R410A_3D INVERTER_US_NA_171121 2017 SERVICE MANUAL...
Страница 2: ......
Страница 4: ......
Страница 11: ...Specifications Page 7 MOB01 09HFN1 MW0W MOB01 12HFN1 MV0W MOCA01 18HFN1 MT0W...
Страница 12: ...Specifications Page 8 MOD01 23HFN1 MT0W...
Страница 15: ...Specifications Page 11 PCB board of MOD01 23HFN1 MT0W...
Страница 16: ...Specifications Page 12 IPM board of MOD01 23HFN1 MT0W...
Страница 101: ...Troubleshooting Page 97 Remark Measure the DC voltage between P and N port The normal value should be around 310V...