![Midea IC SI-A-1205 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/midea/ic-si-a-1205/ic-si-a-1205_service-manual_1791255021.webp)
21
5). Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
6). Set the 3-way valve to the closed position immediately
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
Disconnect the charge set, and tighten the 2-way and 3-way valve’s stem nuts.
Use a torque wrench to tighten the 3-way valves service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
2. Air purging by the refrigerant
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the closed position.
2). Connect the charge set and a charging cylinder to the service port of the 3-way valve
Leave the valve on the charging cylinder closed.
3). Air purging.
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 45’ for 3 seconds then closing it for 1 minute; repeat 3 times.
After purging the air, use a torque wrench to tighten the flare nut on the 2-way valve.
4). Check the gas leakage
Check the flare connections for gas leakage.
5). Discharge the refrigerant.
Содержание IC SI-A-1205
Страница 1: ...IC INVERTER SERIES Service Manual 2012 ICSI A 1205...
Страница 10: ...10 Model W D H W1 A B MOR 09HDN1 QC2 660 265 540 732 458 276 MOR 12HDN1 QC2...
Страница 12: ...12 5 Wiring Diagram 5 1 Indoor Unit MSIC 09HRDN1 QC2 MSIC 12HRDN1 QC2...
Страница 13: ...13 5 2 Outdoor Unit MOR 09HDN1 QC2 MOR 12HDN1 QC2...
Страница 24: ...24 Use torque wrench to tighten the service port cap to a torque of 18N m Be sure to check for gas leakage...