Manufacturing Test
UG0617 User Guide Revision 4.0
45
Figure 24 •
Configuring the Device
6.
Click
Run
to program the device.
7.
After the device is programmed successfully, a status message is displayed. For example, “Run
Program PASSED”.
8.
Press the
SW1
switch, then
LED5
and
LED6
will glow.
9.
Press the
SW2
switch, then
LED7
and
LED8
will glow.
10. Press the
SW3
switch, then
LED1
and
LED2
will glow.
11. Press the
SW4
switch, then
LED3
and
LED4
will glow, confirming that the program is passed.
8.5
Running the Manufacturing Test
The following steps describe how to set up the Tera Term to perform the manufacturing test.
1.
Connect the USB cable (mini USB to Type A USB cable) to J47, and connect the other end of the
cable to the USB port of the host PC.
2.
Open the
Tera Term
from the Start menu.
Figure 25 •
Tera Term: New Connection Window
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from