7 Commissioning
7.1 General
The commissioning should only be done by qualified personnel. The guarantee will be void if this
is not adhered to.
7.2 Commissioning
Before operating the appliance, the following should be done:
- Switch off the electrical power supply of the appliance
- Remove the case.
- Check the leak-tightness of the gas connection
- Check whether the electrical connection and the earthing have been properly installed.
Also check whether the phase (L) has been connected properly. The boiler is phase sensitive.
- Twist open the cap of the automatic air vent.
- Fill the appliance and the system with water.
- Fill the condensate bottle trap with water. The beaker on the bottom can be easily unscrewed
and filled.
- Check the flue gas discharge connection and, if present, the air supply connection.
- Open the gas valve and purge the gas supply.
- Check the spark gap of the ignition electrode 4mm to the earth rod and 5mm to the burner.
- Check the gap of the rectification electrode 10mm to the burner.
- Switch on the electrical power supply of the appliance.
- Check the built in pump for free and correct rotation.
- Start the boiler
Check the boiler at full load.
Allow the boiler to run at full load and stabilise (around 3 minutes). At full load, the following settings
should be checked and corrected if necessary:
Reference value for full load
Reference value for CO
2
and CO
Type
Natural Gas
(G20) CO
2
Natural Gas
(G20) CO
Propane (G31)
CO
2
Propane (G31)
CO
WM/45
8.8 %
< 75ppm
9.8%
< 100ppm
WM/65
8.8%
< 75ppm
9.8%
< 100ppm
WM/85
8.8%
< 75ppm
9.8%
< 100ppm
WM/100
9.4%
< 75ppm
10.4%
< 100ppm
WM/120
8.8%
< 75ppm
9.8%
< 100ppm
Measure the gas pressure before the gas valve. At full load, this must be at least 18 mbar for
natural gas and 33 mbar for propane. If there are several boilers, this pressure should be measured
with all the boilers operating at full load.
Check the water-side temperature difference (∆t) between the flow and return connections of
Содержание Ultramax WM 100
Страница 46: ...MHS Boilers Ltd 191007 46 ...
Страница 47: ...MHS Boilers Ltd 191007 47 ...
Страница 48: ...MHS Boilers Ltd 191007 48 ...
Страница 49: ...MHS Boilers Ltd 191007 49 ...
Страница 50: ...MHS Boilers Ltd 191007 50 Notes ...