48
5. If the old belt cannot be used:
a. Remove the discharge hood and lower the
galvanized belt guards.
b. Install the new belt and connect the two
ends together.
6. Tighten the two drive drum adjusting bolts
equally to 23 ft-lbs. While holding the
adjusting bolt in place, retighten both locking
nuts.
7. Start the conveyor to make sure the belt is
tracking properly. If the belt is not tracking
properly, use the Belt Tracking Adjustment
procedure to correct the problem.
8. Recheck the tension and alignment of the
beltfrequentlyduringthefirsttenhoursof
operation and adjust, as needed.
NOTE:
Then, resume regular maintenance.
Typically,abeltwillseatitselfduringthefirstten
hours of operation and then require less or no
adjustment.
10.6 CHAIN DRIVE SYSTEM
The rotating platform chain should be periodically
maintained to ensure a long service life. Regularly
inspect the chain for potential problems and to
avoidprematurefailure.Earlyidentificationofa
problem is crucial to prevent costly downtimes.
1. The chain drive will operate successfully with
little or no lubrication beyond the initial factory
lubrication. However, periodic lubrication will
greatly extend the functional life of the chain
drive. The chain drive requires lubrication for
four purposes.
a. To resist wear of the pin-bushing joint.
b. To cushion impact loads.
c. To lubricate chain-sprocket contact
surfaces.
d. To retard rust or corrosion.
2. Lubricate the chain with a good grade of clean
petroleum oil without additives. The oil should
befreeflowingfortheambienttemperaturein
which the seed tender is operating.
Recommended Grade Temperature,
o
F
SAE 5
-50 to + 50
SAE 10
-20 to + 80
SAE 20
+10 to +110
SAE 30
+20 to +130
SAE 40
+30 to +140
SAE 50
+40 to +150
Содержание SEED EXPRESS 240 RT
Страница 1: ...FOR OWNERS AND OPERATORS OF THE 240 RT 375 RT SEED EXPRESS ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 21: ...21 6 WARNING Fall Hazard 19939 7 WARNING Hot Surface 20088 8 WARNING Missing Shield 19937 ...
Страница 22: ...22 4 SPECIFICATIONS 4 1 OVERALL 240RT SEED TENDER SPECIFICATIONS 6 AND 8 CONVEYORS ...
Страница 23: ...23 4 2 OVERALL 375RT SEED TENDER SPECIFICATIONS 6 AND 8 CONVEYORS ...
Страница 60: ...60 14 1 240RT SEED TENDER ...
Страница 63: ...63 14 1 2 Turret Detail Continued 240RT 74 41 37 32 31 1 45 65 38 52 31 22 26 26 42 64 76 25 33 ...
Страница 64: ...64 14 1 3 Side View Detail 240RT 82 69 6 44 77 30 31 35 16 78 4 5 78 75 75 56 7 7 53 76 89 ...
Страница 66: ...66 14 1 5 Slide Gate Detail 240RT 49 61 36 66 29 86 85 18 ...
Страница 69: ...69 NOTES ...
Страница 70: ...70 14 2 375RT SEED TENDER ...
Страница 73: ...73 14 2 2 Turret Detail Continued 375RT 7 12 19 13 64 10 11 36 6 23 9 16 48 65 13 46 86 86 ...
Страница 74: ...74 14 2 3 Side View Detail 375RT 28 37 60 58 45 59 29 13 13 29 61 21 22 74 74 62 63 25 24 24 56 85 1 89 ...
Страница 76: ...76 14 2 5 Slide Gate Detail 375RT 4 35 51 22 21 3 85 ...
Страница 79: ...79 NOTES ...
Страница 80: ...80 14 3 CONVEYOR 6 80624 14 3 1 Pan Detail 14 3 2 Tube Detail 14 3 3 Discharge Hood Detail ...
Страница 83: ...83 14 3 2 Tube Detail 21 13 12 13 13 37 1 35 1 36 1 13 29 30 13 83 ...
Страница 85: ...85 NOTES ...
Страница 86: ...86 14 4 CONVEYOR 8 80622 14 4 1 Pan Detail 14 4 2 Tube Detail 14 4 3 Discharge Hood Detail ...
Страница 88: ...88 14 4 1 Pan Detail 28 4 27 17 3 15 14 47 13 10 1 36 49 26 25 22 19 19 32 11 1 8 1 9 41 12 29 48 9 50 27 4 ...
Страница 89: ...89 14 4 2 Tube Detail 37 40 39 24 24 22 37 38 37 2 58 59 24 24 24 ...
Страница 92: ...92 14 5 1 Bumper Hitch Trailer A B C 5 6 11 22 21 10 23 24 1 5 19 13 20 9 7 15 7 4 4 ...
Страница 93: ...93 14 5 2 Bumper Hitch Trailer D 12 18 17 2 8 3 16 2 25 18 17 12 26 14 ...
Страница 95: ......