P 27
Please retain product label and instructions for future reference
Step 45
Parts Needed - No. 15 QTY 1
No. 21 QTY 2
Attach the door strip (
No. 15
) to the
back of the secondary door using
4x40mm screws as shown in the illustra-
tion.
Once fixed, place the Tower Bolts
(
No. 21
) roughly into position at the
top/bottom of the door strip. With a
pencil mark around the bolt.
After marking the bolt onto the
frame, drill a hole for the barrel bolt to
locate into.
Following the hole being drilled,
place the tower bolts into position and
secure using the screws provided.
Pre drill
hole
40mm
screw
21
b
c
a
b
d
c
15
a
d
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
Step 46
Parts needed - No. 70 QTY 1
No. 92 QTY 19
Place the floor boards (
No. 70 & 92
)
inside the building flush to the log
boards on one side, as shown in the
illustration.
Continue adding the floor boards
(
internally
) making sure to interlock
each individual board.
Following the same method outlined
previously measure the gap between
the bottom of the tongue (
on the last
board placed
) and the log board.
Using a straight edge mark out the
measurement onto the last floor
board (
No. 70
) and cut along the
length removing the excess.
**Please note:
Mark the final board
2mm under the measurement; This will
allow the timber to expand and
contract correctly.
Once all the floor boards are in
position secure each board into
position using 9x40mm screws per
board.
***Please Note:
Ensure to screw
through each of the floor boards into
the floor bearers.
405x40mm Screws
40mm
screw
Pre drill
hole
This is for illustrative purposes only and may differ from your floor.
70
92
*
trim to fit