Backyard Heartland Rockport 8x12 Скачать руководство пользователя страница 1

16911

STOP!

STOP!

Call Us First!

DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll free number:

1-800-577-9663

or email:

[email protected]

Our staff is ready to provide assistance

April through October M-F 8:00 AM to 4:30 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

Содержание Heartland Rockport 8x12

Страница 1: ...bly or product information call our toll free number 1 800 577 9663 or email customerservice heartlandind com Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST...

Страница 2: ...This page intentionally left blank...

Страница 3: ...ore building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a l...

Страница 4: ...lation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface vis...

Страница 5: ...en designed for general use Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists shown below as shaded Below is a list of additional mate...

Страница 6: ...sorting parts by the category they are listed in RAFTERS x11 7 1 4 x 18 1 4 18 4 x 46 4 cm TRIM x8 3 8 x 1 3 4 x 67 3 4 1 x 4 4 x 172 1 cm x2 19 32 x 3 x 36 3 4 1 5 x 7 6 x 93 3 cm x2 3 8 x 2 3 4 x 8...

Страница 7: ...x 14 8 x 20 cm x2 2 x 3 x 5 1 8 5 1 x 7 6 x 13 cm WD x4 2 x 3 x 7 7 8 5 1 x 7 6 x 20 cm DY OO x2 1 1 4 x 2 1 2 x 69 3 2 x 6 3 x 175 3 cm x2 19 32 x 6 15 16 x 5 1 2 1 5 x 17 6 x 13 4 cm 5 PANEL PARTS L...

Страница 8: ...DWARE BAG x2 3 8 x 19 5 8 x 72 1 x 49 8 x 182 9 cm 6 1 1 4 3 2 cm 2 5 1 cm 2 1 2 6 4 cm 3 7 6 cm 3 4 1 9 cm 2 5 0 cm 3 7 6 cm 2 5 1 cm 1 1 2 3 8 cm x2 x8 x1 WINDOW x2 1 2 1 3 cm 8 x 16 20 3 x 35 6 cm...

Страница 9: ...For best results and aiding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQU...

Страница 10: ...ates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure...

Страница 11: ...3 cm 296 2 cm 357 2 cm 236 2 cm 48 92 5 8 Center on marks Stagger Seams Flush Flush Flush Flush DOOR 1 Orient parts as shown on flat surface Measure and mark Secure using 2 3 nails at each mark and 4...

Страница 12: ...squareness by measuring diagonally across the corners If the measurements are the same the frame is square The diagonal measurement will be approximately 170 1 4 432 4 cm When the frame is level and...

Страница 13: ...e is square by installing 1 panel and squaring frame Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The me...

Страница 14: ...ent on the floor joists 5 x1 x1 x110 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm 5 8 x 44 5 8 x 96 1 6 x 113 3 x 243 8 cm 2 5 1 cm FLOOR PANELS Secure panels using 2 nails 6 apart on edges and 12 apart insid...

Страница 15: ...alling floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over ha...

Страница 16: ...cm UM x7 TM YF TM YF HINT For easier nailing stand on frame x2 2 x 4 x 72 5 1 x 10 2 x 182 9 cm TM x2 2 x 4 x 68 5 8 5 1 x 10 2 x 174 3 cm YF x7 2 x 4 x 68 5 1 x 10 2 x 172 7 cm UM x32 14 DOOR 3 7 6 c...

Страница 17: ...cm Place 48 x 72 panel onto wall frame flush to top of frame Use the gauge block to mark the 3 4 measurement on the wall stud Secure panel using 2 2 nails in the corners Fig A Ensure your wall frame...

Страница 18: ...ing up Nail using 2 nails 6 apart on edges and 12 apart inside panel 6 Place end 44 5 8 x 72 panel on frame as shown with primed side facing up Nail using 2 nails 6 apart on edges and 12 apart inside...

Страница 19: ...2 3 8 cm 1 1 2 3 8 cm 1 1 2 3 8 cm UM x7 TM YF TM YF HINT For easier nailing stand on frame x2 2 x 4 x 72 5 1 x 10 2 x 182 9 cm TM x2 2 x 4 x 68 5 8 5 1 x 10 2 x 174 3 cm YF x7 2 x 4 x 68 5 1 x 10 2 x...

Страница 20: ...wall frame is square by installing 1 panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the...

Страница 21: ...p Nail using 2 nails 6 apart on edges and 12 apart inside panel 5 Place end 44 5 8 x 72 panel on frame as shown with primed side facing up Nail using 2 nails 6 apart on edges and 12 apart inside panel...

Страница 22: ...1 cm SZ x3 2 x 4 x 68 5 x 10 2 x 172 7 cm UM x12 3 7 6 cm 20 20 1 2 44 1 2 68 1 2 89 68 52 1 cm 1 1 2 3 8 cm 113 cm 174 cm 226 1 cm 172 7 cm BACK WALL FRAME Orient parts on edge on floor Measure and m...

Страница 23: ...THE PRIMED SIDE FACING UP 3 4 GAUGE BLOCK 6 15 2 cm 1 2 5 cm 3 4 1 9 cm Flush For squareness maintain 3 4 measurement along panel edges BEGIN HERE 12 30 2 cm Place 48 x 72 panel onto wall frame as sho...

Страница 24: ...121 9 x 182 9 cm x32 2 5 1 cm 22 BACK WALL PANELS 6 15 2 cm 1 2 5 cm 3 4 1 9 cm Flush 12 30 2 cm Place 2nd 48 x 72 panel onto wall frame flush to installed panel Secure panel using 2 nails 6 apart on...

Страница 25: ...ide of back of wall panel Fig A Secure PT to top plate using 8 3 screws 4 3 7 6 cm Screws INSIDE OF SHED PT PT x1 2 x 3 x 96 5 1 x 7 6 x 243 8 cm PARTS REQUIRED Your back wall is now assembled FINISH...

Страница 26: ...r easier nailing stand on frame 15 3 4 40 cm 15 3 4 40 cm 16 1 2 41 9 cm 16 1 2 41 9 cm x1 2 x 4 x 89 5 x 10 2 x 226 1 cm SZ 3 7 6 cm PARTS REQUIRED x8 FRONT WALL BEGIN 1 UM RD SZ UM RD 3 7 6 cm Nails...

Страница 27: ...2 cm 6 15 2 cm PARTS REQUIRED FRONT WALL x2 x38 2 5 1 cm OO 3 7 6 cm For squareness maintain flush along panel edges Flush Flush Flush Flush SZ Place 19 5 8 x 72 panel onto wall frame flush to SZ wit...

Страница 28: ...B Secure using 5 3 screws on angle and spaced evenly 4 You have finished building your front wall FINISH Fig B Flush to 2x4 Flush Front wall panel Front wall panel UM FW SZ FW FW NOTE Drive screws at...

Страница 29: ...x2 x27 RIGHT SIDE WALL INSTALLATION x1 2 x 4 x 69 7 8 5 1 x 10 2 x 177 5 cm WW TEMPORARY 3 7 6 cm Screws 1 panel overhang WW 3 Nails into bottom plate DOOR DOOR ENSURE 20 5 8 MEASUREMENT IS TOWARD BA...

Страница 30: ...using 3 nails Fig A x12 x2 x27 LEFT SIDE WALL INSTALLATION 3 7 6 cm Screws WW 3 Nails into bottom plate DOOR DOOR Install 1 wall panel overhang toward the bottom BEGIN Center left sidewall assembly o...

Страница 31: ...RE SECURING Fig A 3 7 6 cm Screw 3 7 6 cm Screw 3 7 6 cm Screw 3 7 6 cm Screw Flush Flush x4 1 2 Set back wall on side wall top plates between left and right walls BEGIN Secure wall using 3 screws int...

Страница 32: ...oor frame Fig B 6 15 2 cm 3 7 6 cm Nails 3 7 6 cm Nails into bottom plate 2 5 1 cm Nails BACK WALL INSTALLATION x18 1 1 2 3 8 cm PARTS REQUIRED 4 Secure top plates to side walls using 2 3 nails into l...

Страница 33: ...e walls Secure top plate to side walls using 2 3 nails Fig A B E Secure lower edge of panel to floor frame using 8 2 nails 6 apart Angle nail to hit floor frame Fig C Secure bottom plates using 3 3 na...

Страница 34: ...ACHED Repeat STEPS 2 4 to build 3 additional rafter assemblies Remove DY SET ASIDE ONE GUSSET WITH FINISHED WOOD GRAIN PATTERN Secure gusset to rafters using 12 2 nails as shown 4 5 3 2 107 1 8 272 1...

Страница 35: ...EGIN 1 Align over studs Fig B Fig A Flush to inside of panel Install the 1 GUSSET rafter aligned with front stud flush to inside of front wall panelsc and tight to side wall Fig A B Face gusset inward...

Страница 36: ...UY may partially extend into window opening 1 3 4 4 5 cm 1 3 4 4 5 cm 1 5 8 3 8 cm 6 1 2 16 5 cm 17 1 2 44 5 cm YG 6 15 2 cm 6 15 2 cm Flush 2 1 BEGIN Your front wall gable is now assembled FINISH Pl...

Страница 37: ...up Place left back gable panel on YFB as shown Secure using 1 1 2 nails 6 apart 2 1 BEGIN Place right back gable panel on YFB flush to left panel Secure using 1 1 2 nails 6 apart 1 3 4 4 5 cm 3 1 2 8...

Страница 38: ...stalled FRONT WALL GABLE PARTS REQUIRED Caulk on top of front wall panels first as shown Place front gable assembly centered on front wall and flush to rafter peak Fig A Secure front gable panels into...

Страница 39: ...le Z Strip 2 5 1 cm Finish Nails 16 40 6 cm 2 5 1 cm Finish Nails CENTER Z Strip ON WALL PANELS OUTSIDE OF SHED Fig A PT Center Z Strip on back wall panels Fig A Secure Z Strip to PT using 8 2 finish...

Страница 40: ...back wall gable assembly on z strip Gable panels should be flush to wall panel as shown Fig A Secure gable assembly to PT using 2 nails 6 apart Your back gable is now installed 1 BEGIN FINISH Preasse...

Страница 41: ...trim using 10 1 1 4 screws from inside approximately 7 apart Position second WW flush to panel edge and flush to WW already attached Fig A Secure trim using 10 1 1 4 screws from inside approximately 7...

Страница 42: ...ew 1 BEGIN Repeat STEP 1 to make three additional overhang frame assemblies BUILD FOUR OVERHANG FRAMES You have assembled 4 overhang frames FINISH x4 DY Flat WE x4 2 x 3 x 68 7 16 5 1 x 7 6 x 173 8 cm...

Страница 43: ...Clamp in position before screwing Fig C Flush Flush BEGIN 1 Position 2 x 5 spacer flush to front of rafter and wall panel Secure using 2 2 nails Fig A Position overhang framing flush to rafter Fig B C...

Страница 44: ...erhang boards flush to front wall Fig A Secure using 12 1 1 4 screws Ensure overhang boards are flush at peak Fig A 4 x2 3 8 x 7 7 8 x 57 7 8 1 x 20 x 147 cm Primed Side Down x12 1 1 4 3 2 cm INSTALL...

Страница 45: ...1 1 4 3 2 cm Screws Flush Flush Flush Install 2 7 7 8 x 7 7 8 overhang boards flush to front wall and soffit block Fig A Fig B Secure using 2 1 1 4 screws 5 x4 x2 3 8 x 7 7 8 x 7 7 8 1 x 20 x 20 cm P...

Страница 46: ...h Install 2 5 13 16 x 7 7 8 overhang boards flush to front wall and to previously installed overhang boards Fig A Fig B Secure using 2 1 1 4 screws 6 x4 x2 3 8 x 5 13 16 x 7 7 8 1 x 14 8 x 20 cm 1 1 4...

Страница 47: ...first using 3 1 1 4 screws Continue securing overhang frame working upward toward peak Repeat STEP 10 on opposite side Secure overhang framing together using 1 3 screw Fig A x16 1 1 4 3 2 cm Flush Fi...

Страница 48: ...osition WML with primed side out flush to peak and to overhang framing Fig A Secure using 2 finish nails 12 apart as shown Repeat STEP 9 on opposite side with WMR Your front wall overhang is now insta...

Страница 49: ...ur soffit nailer Align WS flush to markings Fig A and use WD as a gauge block as shown Fig B Secure nailer at each stud using 2 nails angled into stud Fig C Use 2 nails at seam Install ZM flush to WS...

Страница 50: ...using 3 2 1 2 screws as shown Fig A Repeat STEP 1 for opposite side Fig B Your back wall soffit blocks are now installed PARTS REQUIRED x6 Fig A Fig B Flush WD WD Flush 3 2 1 2 6 4 cm Screws 3 2 1 2...

Страница 51: ...ang Fig C and side wall Secure using 1 1 4 screws 12 apart and angle into rafter Fig C Secure using 1 1 4 screws 12 apart and angle into rafter Fig C 2 BEGIN 1 Repeat STEPS 1 2 on the opposite side Yo...

Страница 52: ...using 6 15 16 measurement down and flush to bottom of soffit board as shown Secure cap using 3 2 finish nails as shown Fig A Repeat STEP 1 to install right corner soffit cap Fig B You have finished at...

Страница 53: ...ing Roof panels may cause serious injury until securely fastened 1 BEGIN 2 5 1 cm PARTS REQUIRED ROOF PANELS Two Nails 4 8 1 2 1 9 c m Flush Fig D Flush at peak Fig B Flush at peak 7 16 x 47 7 8 x 48...

Страница 54: ...s 6 apart on edges and 12 apart inside panel Attach 22 x 96 roof panel flush to the installed panel Fig I and front rafter Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel...

Страница 55: ...RTS REQUIRED COLLAR TIES FINISH 1 BEGIN Position and level 2 TKA collar ties on 2nd and 4th rafter from back wall HINT For best appearance install collar tie on rafter facing away from door opening Yo...

Страница 56: ...1 cm Finish Nails Flush Position left and right corner soffit cap Primed Side Out flush to bottom of overhang as shown Secure using 3 2 finish nails Fig A Fig B Position center gable decorative trim...

Страница 57: ...to roof panels Fig A Secure using 2 2 finish nails at each rafter and 4 2 finish nails at seam Repeat STEP 1 to install fascia fascia boards on the opposite side Your eave fascia boards are now instal...

Страница 58: ...ttach temporary supports OO and GAA as shown OO GAA OFFSET 4 3 7 6 cm Screws 1 1 4 3 cm Screws 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm x4 Bottom edges Flush 1 x 3 x 5 2 5 x 7 6 x...

Страница 59: ...n 2 3 3 7 6 cm Screws into door trim 3 7 6 cm Screw 3 7 6 cm x13 OO Flush against wall panels Fig A OO Attach temporary support OO as a ledger board flush under wall panels for doors to rest on using...

Страница 60: ...installed DOOR PARTS REQUIRED FINISH 3 4 1 9 cm x44 2 5 1 cm x8 Center 7 17 8 cm 7 17 8 cm 2 Nails x8 Fig B Nail into framing Door Trim Hinge Board Fig A Door Panel WR GI GI 2 Center trim WR over door...

Страница 61: ...m HINT Caulk behind frame near edge before installing x2 BEGIN 1 From outside of shed position window in opening and level Use 2 screws at top of windows Do not fully tighten screws 2 Apply high quali...

Страница 62: ...Remove 1 1 4 screws Position WA centered on inside window frame as shown Secure using 2 2 finish nails Flush Flush Flush EY x 2 WA WA Centered 31 78 7 cm Centered Centered x2 19 32 x 2 1 2 x 36 3 4 1...

Страница 63: ...s WINDOWS x12 3 4 1 9 cm 6 Your window is now installed FINISH Install 3 4 screws as shown From inside snip or bend over protruding finish nails Do not screw into window flange INSIDE OF SHED Snip off...

Страница 64: ...IP OO FINISH Fig A Center OO in door opening 11 27 9 cm Approximately BEGIN Center OO s vertically on the left and right doors as shown Fig A Fig B Secure using 7 2 screws through outside trim into OO...

Страница 65: ...when loop is contacting base Fig A Mark and pre drill holes for screws Mark and pre drill holes for screws 1 LEFT DOOR 63 PARTS REQUIRED DOOR x2 5 16 0 8 cm Drill Bit Your spring bolts are now install...

Страница 66: ...ough DOOR HARDWARE DECORATIVE HINGES x1 3 4 1 9 cm x16 x4 x2 PARTS REQUIRED 1 1 2 3 8 cm BEGIN 1 1 2 1 3 cm Drill Bit 1 4 0 6 cm Drill Bit Flush to hinge Fig A Attach inside handle and secure with set...

Страница 67: ...ISH Your corner trim is now installed 67 3 4 172 1 cm 67 3 4 172 1 cm x4 3 8 x 1 3 4 x 67 3 4 1 x 4 4 x 172 1 cm BEGIN 1 Attach corner trim as shown using 2 finish nails Flush under gable panel Seam i...

Страница 68: ...om bottom and 1 in from inside face into solid 2x3 framing BEGIN 1 FINISH Swing door open to locate eye Repeat installation for 2nd hook and eye Fig A Install hook into endcap and into 2x3 behind as s...

Страница 69: ...nd one vent in the back wall gable Caulk behind vent flanges Your vents have now been installed Secure using 1 2 screws x12 1 2 1 3 cm x2 VENTS 8 x 16 20 3 x 35 6 cm 6 15 2 cm 3 5 7 6 12 7 cm 14 35 6...

Страница 70: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Страница 71: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Страница 72: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Страница 73: ...t ridge cut to peak with a utility knife Repeat STEPS 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Страница 74: ...ut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Страница 75: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut 1 piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge c...

Страница 76: ...siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This...

Отзывы: