
39
7"
(17,8 cm)
BEGIN
1
HINT:
Clamp in position
before screwing.
1-1/4" (3,2 cm)
Screws
BACK GABLE TRIM
FINISH
Position (1)
WW
flush to back gable panel edge and center with panel seam
(Fig. A)
.
Secure trim using (10) 1-1/4" screws from inside, approximately 7" apart.
Position second
WW
flush to panel edge and flush to
WW
already attached
(Fig. A)
.
Secure trim using (10) 1-1/4" screws from inside, approximately 7" apart.
Your back gable trim is now installed.
2
PARTS REQUIRED:
WW
Fig. B
Fig. A
Flush
Flush with panel edges.
Flush with
panel edges.
x2
2 x 4 x 69-7/8" (5,1 x 10,2 x 177,5 cm)
WW
1-1/4" (3,2 cm)
x20
Содержание Heartland Rockport 8x12
Страница 2: ...This page intentionally left blank...