P 20
Please retain product label and instructions for future reference
Pre drill
hole
Please note: You can adjust the blocks
attached to the roof truss’ if necessary
.
90mm
screw
Step 31
Parts needed - No. 48 QTY 2
Locate two ‘Roof Truss A’
(No. 48)
into the gaps between the finisher boards on either
side of the log cabin as shown in the illustration.
Some adjustment may be required to ensure the roof structure rests correctly.
Fix in place by screwing into the purlin at an angle as shown in the illustration using
1x90mm screws per Roof Truss.
Secure each Finisher board
(No.45)
in place
by screwing through the board into the
Roof Truss using 70mm screws, ensuring to stagger the screws to avoid colliding.
2x90mm Screws
4x70mm Screws
48
48
48
48
70mm
screw
Left Handed
Right Handed
IMPORTANT:
Pre-drill before fixing screws.
Rubber Mallet
may be required
to fit parts.
45
45
45
45
48
48
45
45
45
45
48
48
Step 32
Parts needed - No. 48 QTY 2
No. 89 QTY 2
Place the Finisher boards (
No. 89
) either side of the log cabin, locating each board flush to the central gable.
Locate two ‘Roof Truss A’
(No. 48)
flush to the finisher boards on either side of the log cabin, as shown in the illustra-
tion.
Some adjustment may be required to ensure the roof structure rests correctly.
Fix the Truss
(No. 48)
in place by screwing into the purlin at an angle, as shown in the illustration using 1x90mm
screws per Roof Truss.
Secure each Finisher board
(No.89)
in place
by screwing through the board into the Roof Truss and gable using
70mm screws, ensuring to stagger the screws to avoid colliding.
2x90mm Screws
4x70mm Screws
70mm
screw
90mm
screw
Pre drill
hole
Please note: You can adjust the blocks
attached to the roof truss’ if necessary
.
Left Handed
Right Handed
48
89
48
89
48
48
89
89
48
89
48
89
IMPORTANT:
Pre-drill before fixing screws.
Rubber Mallet
may be required
to fit parts.