background image

P 16

Step 23

Parts needed - No. 94 QTY 2

Place the double storm braces  (

No.94

) on either side of the log cabin, (Internally and externally) ensuring to 

locate them centrally over where the middle log boards sit flush, as shown in the illustration. 

*Ensure the storm braces are secured at the highest point possible on each side.

The storm braces will need to be altered during the buildings life as the moisture content within the log boards 

changes. The boards will expand during periods of high moisture (Winter) and shrink during periods of low 

moisture (Summer.)

**Storm braces will help your building expand and contract properly.

***It is important that each bolt is tightened using a  washer so as not to damage  the log boards.

Secure the double storm braces into position from the inside of the cabin using 4x90mm bolts per 2 storm  

braces (2 at the top, 2 at the bottom), making sure the  washer & nut are tightened from the outside of the log 

cabin. Ensure the bolts go through both the internal and external double storm brace. 

8x90mm Bolts

Pre drill 

hole

90mm 

bolt

IMPORTANT: 

Pre-drill before fixing screws.

Right Handed

Left Handed

94

94

94

94

Step 24

Parts needed - No. 74 QTY 2

 

 

    

 

   

Place the gable tops 

(No. 74) 

onto the assembly. 

Fix into position by screwing through the notches as 

shown in the illustration.

*Ensure that the boards are level and flush with each 

other as you lay each one.

**Ensure to stagger the screws so as not to collide with 

the previous screw.

4x120mm Screws

Pre drill 

hole

120mm 

screw

74

74

Left Handed

Right Handed 

74

74

IMPORTANT: 

Pre-drill before fixing screws.

Rubber Mallet 

may be required 

to fit parts.

94

94

94

Please retain product label and instructions for future reference

 

Содержание 0634RASH0302FBSDNW-V1

Страница 1: ...e are going to be constructed Ensure that there will be access 60cm to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm ground to prevent distortion Re...

Страница 2: ...87 Finisher Board 34x80x70mm QTY 2 LB34RG80 C 70 Finisher Board 34x80x886mm QTY 4 LB34RG80 C 886 Floor Board 16x121x2736mm QTY 19 MB16 2736 Double Storm Brace 16x120x2110mm QTY 4 S16120 2110 All compo...

Страница 3: ...both contents lists for the 3m x m3 Corner Cabin 0634CSBE0303HGDD2SW as well as the 5m x 3m Corner Lodge The component numbers listed below are the same component numbers as listed in the 3m x 3m Corn...

Страница 4: ...er end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Pre Assembly Please note To construct the 5m x 3m Corner Lodge all comp...

Страница 5: ...ers are square by measuring from corner to corner as illustrated making sure they are an equal measurement If the bearers are not alligned equally unscrew and adjust and re align accordingly 10x90mm S...

Страница 6: ...d equally unscrew adjust and re align accordingly 8x90mm Screws Example picture 2 screws per bearer per end 91 53 91 53 Step 4 Parts needed No 91 QTY 9 Arrange the remaining bearers No 91 inside the a...

Страница 7: ...ence Please ensure to construct your Log Cabin by following either the Left Handed or Right Handed instructions dependant on which side you choose Align the two bases together by the longest bearer as...

Страница 8: ...re drill before fixing screws 40 36 22 41 32 83 83 40 Right Handed 40 36 22 40 32 41 83 83 Ensure boards sit flush Rubber Mallet may be required to fit parts Pre drill hole Step 6 Right Handed Parts N...

Страница 9: ...ethod as shown in the illustrated Please note the right hand side of the door will be slightly higher This will even out when the rest has been assembled Ensure that the boards are level and flush wit...

Страница 10: ...rame should be positioned on the inside of the building 14 12 IMPORTANT Pre drill before fixing screws 79 77 76 79 77 78 Pre drill hole 80mm screw Step 10 Parts Needed No 76 QTY 1 No 77 QTY 1 No 78 QT...

Страница 11: ...can establish the position of the hinges The hinges come in three parts Remove th doors from the frme after fitting Ensure to screw into the framing and not into the channel 63x30mm Screws a b 17b a b...

Страница 12: ...83 87 86 41 41 83 87 86 41 41 29 29 41 23 24 30 31 29 30 31 Rubber Mallet may be required to fit parts No 41 QTY 18 No 83 QTY 6 No 86 QTY 6 No 87 QTY 6 Pre drill hole 80mm screw IMPORTANT Pre drill be...

Страница 13: ...level with each end Please note This image is for illustrative purposes and may differ from your choice in product regarding window position Nevertheless the process of fitting the window is the same...

Страница 14: ...t Handed Step 20 Parts needed No 28 QTY 1 No 35 QTY 1 No 37 QTY 1 No 41 QTY 3 No 83 QTY 1 No 85 QTY 1 Lay the remaining boards No 28 35 37 41 83 85 onto the log cabin following the method as shown in...

Страница 15: ...er board 2x60mm Screws Left Handed Right Handed 41 36 34 27 41 36 34 27 41 83 41 83 41 41 IMPORTANT Pre drill before fixing screws Rubber Mallet may be required to fit parts Pre drill hole 80mm screw...

Страница 16: ...braces into position from the inside of the cabin using 4x90mm bolts per 2 storm braces 2 at the top 2 at the bottom making sure the washer nut are tightened from the outside of the log cabin Ensure t...

Страница 17: ...into the Purlin at an angle as shown in the illustration using 1x90mm screw per truss 3x90mm Screws Step 26 Right Handed Parts needed No 48 QTY 1 No 50 QTY 1 No 51 QTY 1 Place the Central roof Truss R...

Страница 18: ...note You can adjust the blocks attached to the roof truss if necessary Rubber Mallet may be required to fit parts 50 51 48 49 51 50 49 48 48 90 48 90 Step 28 Parts needed No 48 QTY 4 Place 2x RoofTru...

Страница 19: ...47 46 47 46 47 IMPORTANT Pre drill before fixing screws Step 30 Parts needed No 42 QTY 1 No 43 QTY 1 No 44 QTY 1 No 45 QTY 6 Place the finisher boards No 42 43 44 45 around the front of the log cabin...

Страница 20: ...er Mallet may be required to fit parts 45 45 45 45 48 48 45 45 45 45 48 48 Step 32 Parts needed No 48 QTY 2 No 89 QTY 2 Place the Finisher boards No 89 either side of the log cabin locating each board...

Страница 21: ...in place by screwing through the board into the Roof Truss using 70mm screws ensuring to stagger the screws to avoid colliding 2x90mm Screws 8x70mm Screws 70mm screw Pre drill hole Please note You can...

Страница 22: ...ach layer of roof boards one by one Ensure the roof boards are not laid too close together use the spacers No 69 provided to create a 2mm gap Adjusting the spacing between the boards allows the wood t...

Страница 23: ...x40mm Screws Pre drill hole 40mm screw 72 73 73 71 72 A B C C 71 71 D D B Left Handed Right Handed 71 A B C C 93 93 D D B 73 72 72 73 Step 37 Parts needed No 71 No 72 No 73 No 93 HINT keep the roof bo...

Страница 24: ...ng screws Pre drill hole 71 93 93 73 72 72 73 72 73 73 71 72 71 71 Pre drill hole 40mm screw Step 39 Parts needed No 71 No 72 No 73 No 93 HINT keep the roof board packs seper ate to prevent mixing the...

Страница 25: ...TY 2 Fix the casement stay No 8 onto the window No 1 and the casement stay pins to the window framing using 6x30mm screws as shown in the illustration Ensure the casement stay is centralised on the wi...

Страница 26: ...can be closed and the lock works If your doors do need adjusting please look at step 20 if not proceed to the next step 12x30mm Screws Pre drill hole a b 30mm screw The Mortice Lock is Reversible a b...

Страница 27: ...92 QTY 19 Place the floor boards No 70 92 inside the building flush to the log boards on one side as shown in the illustration Continue adding the floor boards internally making sure to interlock eac...

Страница 28: ...dge of floor internally measure and cut down accordingly to best match the internal space Secure each trim section into place using 6x30mm spaced equally along the board as shown in the illustration D...

Страница 29: ...lt tacks 1 2 3 4 Felt strip dimensions 1 3600mm L x 200mm W 2 2340mm L x 200mm W 3 1700mm L x 200mm W 4 1720mm L x 200mm W IMPORTANT Pre drill before fixing screws 65 62 Step 51 Parts needed No 62 QTY...

Страница 30: ...isture Winter and shrink during periods of low moisture Summer Storm braces will help your building expand and contract properly It is important that each bolt is tightened using a washer so as not to...

Отзывы: