Please retain product label and instructions for future reference
P 14
Pre drill
hole
70mm
bolt
Step 24
Parts needed - No. 41 QTY 8
Arrange the storm braces (No.41)
around the building (internally).
Place 2x storm braces per side
fixing into place using 2x 70mm
bolts per brace making sure the
washer & nut are tightened from
the outside of the building.
*Ensure the storm braces are
secured at the highest point
possible on each side.
The storm braces will need
to be altered during the buildings
life as the moisture content within
the log boards changes. The boards
will expand during periods of high
moisture (Winter) and shrink during
periods of low moisture (Summer.)
**Storm braces will help your
building expand and contract
properly.
***Important: Ensure each
bolt is tightened using a
washer so as not to damage
the log boards.
16x70mm Bolt Sets
41
41
Step 25
Lift each door onto the
already existing hooks on the
Garage door frame, ensuring
the hook and bands connect.
*Some adjustment may be
required to align properly.
CAUTION:
THESE DOORS
ARE EXTREMELY HEAVY!