P 10
Please retain product label and instructions for future reference
Step 15
Parts Needed - No. 22 QTY 2
Place the gable tops (No. 22)
onto the log cabin. Fix into
position by screwing through
the notches as shown in the
illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
4x70mm Screws
Pre drill
hole
70mm
screw
IMPORTANT:
Pre-drill before fixing screws.
22
22
Rubber Mallet
may be required
to fit parts.
Pre drill
hole
70mm
screw
30
30
30
a
b
Step 16
Parts needed - No. 30 QTY 3
Align the Roof Purlins (No. 30)
into the cut out slots on each gable top
ensuring each purlin interlocks into the
boards.
Secure the purlins at each end
by screwing through the roof purlins
into the boards (ensure to pre-drill to
avoid the boards splitting) using
4x70mm screws per purlin.
*Please note:
The gable shown is for
illustrative purposes and may differ
in width from your choice in product.
Nevertheless, despite any differences
the process of fixing the purlins
is the same.
12x70mm Screws
a
b
IMPORTANT:
Pre-drill before fixing screws.
Rubber Mallet
may be required
to fit parts.