For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
P 4
Please retain product label and instructions for future reference
Pre-assembly
*Please note:
Each board interlocks at
either end in a staggered pattern.
Before securing ensure that the boards
are fitted properly in their respective
tongues and grooves.
IMPORTANT:
Pre-drill before fixing screws.
32
32
31
31
Pre drill
hole
70mm
screw
Step 1
Parts needed - No. 31 QTY 13
No. 32 QTY 2
Lay the bearers (No’s 31 & 32) onto a
firm and level surface (free from
areas where standing water can
collect) as shown in the illustration.
Fix the framing together at each
corner using 8x70mm screws,
ensuring the frame is flush.
Once fully assembled, ensure the
bearers are square by measuring
from corner to corner as illustrated,
making sure the measurements are
equal.
If the bearers are not aligned equal-
ly, unscrew, adjust and re-align
accordingly.
8x70mm Screws
a
Example picture
2 screws per bearer per end.
=
=
IMPORTANT:
Pre-drill before fixing screws.
31
31
Pre drill
hole
70mm
screw
Step 2
Parts needed- No. 31 QTY 11
Following the same method
arrange the remaining framing
(No. 31) inside the assembled
frame.
*Ensure there is an equal
amount of space between
each frame.
Secure each of the frames in
place using 2x70mm screws
for each side of the bearer,
ensuring the framing remains
level.
44x70mm Screws
31
31
31
31
31
31
31
31
31
31
31
32
Pre drill
hole
70mm
screw
Step 3
Parts needed- No. 31 QTY 13
No. 32 QTY 2
Repeat Steps 1 & 2 to create the
second base section.
*Ensure there is an equal
amount of space between each
frame.
Once built secure both base
sections together using 70mm
screws as shown in the
illustration.
64x70mm Screws
IMPORTANT:
Pre-drill before fixing screws.