P 5
P 3
P 5
Please retain product label and instructions for future reference
Once the boards are square, lift up the log board (No. 27) and fix the
starter boards in place.
Fix each of the starter boards to the frame by screwing through the
notch into the frame as shown in the illustration.
4x70mm Screws
23
Pre drill
hole
70mm
screw
Step 4
Parts Needed - No. 23 QTY 2
No. 27 QTY 2
Place the starter boards (No’s. 23) on to assembled base frame along the
shortest sides and place the first two log boards (No. 27)
in the notch as
shown.
Ensure the boards sit square on the base using the same method used
in Step 1. Measure corner to corner, making sure the measurements are
equal.
27
23
IMPORTANT:
Pre-drill before fixing screws.
23
23
27
27
Step 5
Parts Needed - No. 24 QTY 6
No. 26 QTY 6
No. 27 QTY 12
No. 28 QTY 6
Following the method shown in
the illustration, lay the first 6
boards (No’s. 24, 26, 27 & 28)
onto the starter boards to create
your first level.
*Make sure that you have seven
rows of log boards in total
below the window.
*Ensure that the boards are
level and flush with each
other as you lay each one.
**Please Note:
The short boards
at the front of the building (either
side of the door and window
opening’s) can be placed either
side depending on your needs.
27
24
27
28
26
Rubber Mallet
may be required
to fit parts.