background image

Please retain product label and instructions for future reference

             

IMPORTANT : 

Pre-drill before fixing screws.

Pre drill 

hole

30mm 

screw

Step 26

Parts Needed - No. 18 QTY 2

 

 

   No. 19 QTY 1

 

 

   

No. 20 QTY 1

Fit the Dead Lock (No. 19) into the recess 

in the master door (No. 9) and secure 

using the screws provided. Attach the Key 

Plate (No. 20) to the slave door (No. 10) 

with 4x30mm screws.

After fixing the Dead lock, add the pull 

handles 

(No. 18)

 with 4x30mm black 

screws each.  Be sure that the screws fix 

into the framing on the otherside of the 

door.

**You have been provided with an 

additional set of pull handles (No. 18).  

These can be used internally on the 

Garage doors, dependant on your wants 

and needs.  Ensure to stagger screws so 

they do not collide.

*Please note:

 This image is for illustrative 

purposes and may differ from your choice in 

product (

regarding ironmongery

). Never-

theless the process of fixing  is the same.

8x30mm Black Screws

4x30mm Screws

30mm 

screw

The Lock is Reversible

a

20

9

10

18

19

19

P 15

a

b

c

c

Step 27

Parts Needed - No. 15 QTY 1

 

 

   No. 21 QTY 2

Attach the Door Strip (No. 15) to the 

back of the slave door using 4x40mm 

screws as shown.

 

Once fixed, place the Pad 

 Bolts 

(No. 21) roughly into 

 

position and with a pencil 

 

mark the around the bolt.

 

After marking the bolt onto

 

the frame, drill a hole for the

 

barrel bolt to locate into.

 

Following the hole being

 

drilled, place the pad bolts

 

into position and secure using

 

the screws provided.

4x40mm Screws

Pre drill 

hole

40mm 

screw

IMPORTANT : 

Pre-drill before fixing screws.

b

a

21

15

Содержание 0628WKNE0405LBDD2SW-V1

Страница 1: ...s of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60...

Страница 2: ...71x70x805mm Qty 2 AI 0628LOGSWBF V3 7 Flag Hinge QTY 4 PI 07 0211 8 Double Door Contents 10 9 11 12 Dead Lock Qty 1 PI 07 0200 Key Plate Qty 1 PI 07 0200 Pad Bolt QTY 2 PI 07 0183 Master Door Qty 1 M...

Страница 3: ...44x2316mm QTY 26 F4444 2316 PT Bearer 44x44x3808mm QTY 4 F4444 3808 PT Fascia 120x16x2118mm QTY 4 S16120 G 2118 1X14 CUT Floor Board 121x16x3752mm QTY 44 MB16 3752 Roof Board 121x16x2114mm QTY 92 MB16...

Страница 4: ...measurements are equal If the bearers are not aligned equal ly unscrew adjust and re align accordingly 8x70mm Screws a Example picture 2 screws per bearer per end IMPORTANT Pre drill before fixing scr...

Страница 5: ...are on the base using the same method used in Step 1 Measure corner to corner making sure the measurements are equal 27 23 IMPORTANT Pre drill before fixing screws 23 23 27 27 Step 5 Parts Needed No 2...

Страница 6: ...ing 14 12 13 11 IMPORTANT Pre drill before fixing screws Pre drill hole Step 7 Parts Needed No 9 QTY 1 No 10 QTY 1 No 17 QTY 6 Fasten six hinges No 17 to the door and the frame with the screws supplie...

Страница 7: ...osition Nevertheless the process of fitting the door frame is the same Please Note The short boards at the front of the building either side of the door and window opening s can be placed either side...

Страница 8: ...dow using 4x30mm screws attach the male part of the flag hinge No 7 to the window frame using 4x30mm screws ensuring that the window can open and close freely It is important to fit the windows within...

Страница 9: ...lush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame 38 28 24 26 27 25 26 Rubber Mallet may be required to fit parts Step 14 Parts Needed No 24 QTY...

Страница 10: ...ill hole 70mm screw 30 30 30 a b Step 16 Parts needed No 30 QTY 3 Align the Roof Purlins No 30 into the cut out slots on each gable top ensuring each purlin interlocks into the boards Secure the purli...

Страница 11: ...screws making sure that each board is interlocked flush at the bottom meet at the top of the apex The last board on each side will overhang Using a straight edge and a pencil mark out a line as a guid...

Страница 12: ...528x40mm Screws 40mm screw Pre drill hole Cut to fit IMPORTANT Pre drill before fixing screws Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space Closure Trim Interna...

Страница 13: ...angled cuts meet at the top of the apex 12x40mm Screws Pre drill hole 40mm screw IMPORTANT Pre drill before fixing screws Felt tacks Step 22 Parts needed No 42 Cut the felt No 42 into five strips and...

Страница 14: ...de The storm braces will need to be altered during the buildings life as the moisture content within the log boards changes The boards will expand during periods of high moisture Winter and shrink dur...

Страница 15: ...your wants and needs Ensure to stagger screws so they do not collide Please note This image is for illustrative purposes and may differ from your choice in product regarding ironmongery Never theless...

Страница 16: ...sing 6x30mm screws Ensure the casement stay is centralised on the window Use this method to fit the casement stays to both the windows 12x30mm Screws 8 1 8 Step 30 Parts Needed No 6 QTY 1 No 16 QTY 1...

Отзывы:

Похожие инструкции для 0628WKNE0405LBDD2SW-V1