P 8
Please retain product label and instructions for future reference
2
4
IMPORTANT :
Pre-drill before fixing screws.
Step 10
Parts Needed - No. 2 QTY 2
No. 3 QTY 2
No. 4 QTY 2
No. 5 QTY 2
Arrange the left, right, top & bottom window
frames (No’s. 2, 3, 4,& 5) onto a firm and level
surface. Secure the top and bottom frames to
the uprights using 2x80mm screw per corner,
ensuring the screws do NOT protrude through
the front of the window framing. Using the
method outlined assemble two window
frames.
16x80mm Screws
Pre drill
hole
80mm
screw
5
3
5
3
The internal lip of the window
frame should be postioned on
the inside of the building.
30mm
screw
Step 11
Parts Needed - No. 1 QTY 2
No. 7 QTY 4
Position the window
(No. 1)
so that it
sits centrally within the window frame.
Fix the female part of the flag hinge
(No. 7)
to the window using 4x30mm
screws, attach the male part of the flag
hinge
(No. 7)
to the window frame using
4x30mm screws ensuring that the window
can open and close freely.
It is important to fit the windows within the
frame at this stage so that you can establish the
position of the hinges. The hinges come in two
parts. Remove the window from the frame after
fitting.
*Ensure to attach the hinge to the horizontal
frame of the window*
Repeat this method for both windows.
32x30mm Screws
Pre drill
hole
IMPORTANT :
Pre-drill before fixing screws.
7
7
7
1
Step 12
Once you have laid the second
level of boards onto the log cabin
slide the window frames (without
window No. 1) between the smaller
boards and rest on to the longer
board (if you have not yet assembled
the window frames refer to step 10).
*Ensure the boards are level with
each end.
*Please note:
This image is for
illustrative purposes and may
differ from your choice in product
(
regarding window position
).
Nevertheless the process of fitting
the window is the same.