11
Mercedes-Benz Wallbox
| Preparations, installation and taking into operation
DANGER!
Please note that the electronic components of your wallbox will be damaged if you apply a voltage above 250 V between
the L1 current-carrying conductor and neutral.
PLEASE NOTE!
In some countries, the requirements mentioned in this manual differ from the prerequisites for connecting to the local
power grid. In this case, the wallbox must be connected in accordance with the respective type of mains power connection
for the country of installation. You can find an overview of country-specific mains connection schemes on page 26 in
this manual or on the
www.yourwallbox.de
website using the following link:
www.yourwallbox.de/Mains_Connection_Schemes
PLEASE NOTE!
The Mercedes-Benz Wallbox is preset for a charging current of 16 A by the factory. Should your domestic power sup-
ply provide a lower or higher charging current, you must reset the preset current for the wallbox accordingly before you
replace the electronic components cover and then take the wallbox into operation. This is described in detail in section
“Setup and testing modes” on page 16 and following.
Please note that the rated current indicated on the product label and configured in the firmware must under no circum-
stances be exceeded.
13. Replace the electronic components cover inside the housing and fix it
with its torx screw (TX20 bit).
14. Flip the housing cover upwards so that it clicks into the housing and lock
it with the triangular key supplied.
Taking the wallbox into operation
After mechanical and electrical installation, you must check the correct functioning of the Mercedes-Benz Wallbox for opera-
tion and resolve any malfunctions or installation errors that may have occurred.
Proceed as follows to take the Mercedes-Benz Wallbox into operation:
1. Switch on all upstream MCB(s).
2. In addition, switch on the external RCCB (connection of the wallbox to the electricity grid is established).
When the wallbox is reconnected to the electricity grid, it will initiate the start-up procedure: This includes an internal test of
the electronics to ensure correct functioning.