9
Mercedes-Benz Wallbox
| Preparations, installation and taking into operation
5. Fix the mounting plate in position with a screwdriver (TX40 bit) and the
wafer head screws (8 x 60) included.
PLEASE NOTE:
In case the power supply enters from the rear, you must
first thread the cable through the opening in the connection area in the
lower third of the mounting plate before screwing the plate into position.
6. For the cable to enter from the top, you must install the power supply such
that it is inserted into the connection area from above and can be fixed
using its allocated strain relief.
PLEASE NOTE:
The strain relief is not required if the power supply enters
from the rear.
83
7. Now open the housing cover of the wallbox using the triangular key sup-
plied and flip it towards the front.
PLEASE NOTE:
Take special care with this and protect the housing cover
against scratching and other external damage. If possible, only remove the
protective film from the housing cover just before completing installation.
8. Use the screwdriver to loosen the TX20 screw holding the internal elec-
tronic components cover in place and remove it. Keep the screw in a safe
place.
9. The wallbox includes three custom sealing membranes for the openings in
the lower part of the wallbox: Insert these and cut a slit into the large seal-
ing membrane: Now insert the supply cable through this opening.
Содержание 3W72M2
Страница 1: ...Mercedes Benz Wallbox Installation manual for specialist electrical contractors ...
Страница 4: ...iv ...