7
Gate control operating manual mts2000/02
7 - 5
m
eißner gate systems
Maintenance & service
7.2 Regular
testing
1.
Remove cover
2.
Issue open impulse, gate runs into upper limit position
3.
During single lane or dual lane operating mode, wait until the hold open and
pre-warning time has expired.
During impulse control operating mode, issue close command.
4.
Status of LEDs during the test phase (also refer to Fig. 4-1).
LED 1
LED 2
LED 3
LED 4
Before test
0 0 1 1
Test stage 1
1 0 1 1
Test stage 2
0 1 1 1
Test stage 3
0 0 0 1
Test stage 4
0 0 1 0
After test
0 0 1 1
5.
Close housing again once test is complete.
If result of testing is negative, shut down system and call service.
Содержание mts2000/02
Страница 1: ...Control system Gate control mts2000 02 R2 8 ...
Страница 5: ......
Страница 24: ......
Страница 35: ...5 Gate control operating manual mts2000 02 5 11 meißner gate systems Assembly and installation Fig 5 9 Drive ...
Страница 36: ......
Страница 48: ......