7 Delivery, transport, installation and assembly
7.1
Delivery
Check that the delivery is complete immediately after receiving it by comparing it with
MEIKO’s contract confirmation and/or the delivery note.
If necessary, complain about any missing parts immediately to the shipping company and
notify MEIKO.
Check the entire installation for any damage that may have occurred during shipping.
Should you suspect any damage has occurred during shipping, you should inform:
the forwarder,
and MEIKO
in writing, and also send a photo of the damaged parts to MEIKO.
7.2
Transport and installation
In order to avoid damage to the machine and life-threatening injuries when shipping the
system, the following points must be observed:
Transport works must only be performed only by qualified persons observing the safety
instructions.
For safe transport, the machine parts are supported by a special square-timber frame.
The machine must only be transported on the supplied wooden frame. This is specifically
designed to enable safe and secure transport using
two pallet trucks
.
It is possible to negotiate gentle curves if the pallet trucks are not positioned completely
under the wooden bearers
Please also read the chapter on “General safety instructions ".
7.3
Installation and assembly
MEIKO has prepared an assembly diagram showing the machine dimensions and the con-
nected loads in detail.
The machine many only be installed by MEIKO technicians. Assembly is completed by
reference to the installation drawings.
7.4
Electrical connection
Work on the electrical part of the machine may only be undertaken by specialist person-
nel.
The corresponding electrical wiring diagram can be found in the switch cabinet. This wiring
diagram is a part of the machine and must therefore not be removed!
The type plate with the connected electrical loads is located inside the switch cabinet.
General Electrical Regulations must be observed when connecting the machine to the
power supply.
CAUTION!
CAUTION!