31 / 32
9648649
Service step
Maintenance work
Cleaning /
Maintenance
work
Daily
at least once
every quarter
at least once
every six
months
but
every
1000
hrs
at least once
every year
but
every 2000
hrs
10. Electrical installation
Check power consumption of all heating elements(I
N
see wiring diagram)
Tighten all connections
Check all switches for function and damages (see electrical wiring dia-
gram)
Carry out a visual check on all electrical equipment (e.g. switches / cables /
housings / covers).
Check the switch cabinet ventilator entry and discharge filters
11. Detergent dosing
Check the function (if possible, coordinate with chemicals supplier)
12. Rinse agent dosage
Check the function (if possible, coordinate with chemicals supplier)
13. Check the function of the total machine
Check machine for correct interaction of all functions
Dishwashing test.
Check cleaning results, drying results
Air compressors (if present)
Observe the manufacturer’s operating instructions in all cases
Check the oil level
Remove the condensation water from the boiler
14. Visual inspection of the machine environment
Foaming detergents must not be used close to the machine area and not
in connection with the machine
Water treatment system (if present)
Observe the manufacturer’s operating instructions in all cases
Reverse osmosis installation (visual check); inform customers on the ne-
cessity of installation maintenance
Demineralisation installation (visual check); inform customers on the ne-
cessity of installation maintenance.
Detergent circulation tank temperature
55°C to 65°C
Clean water rinse temperature
80°C to 85°C
The service steps
-
must be carried out by personnel trained for this purpose.
trained operating personnel
instructed company tradesmen
trained company tradesmen or installation engineer
installation engineer trained by MEIKO
You can document the completed maintenance work on the following pages. MEIKO recommends that you enter
the half-yearly service steps (
), and the annual service steps (
).