Chemical product settings
The correct settings for the quantity of detergent and rinse aid depend on the product used.
The relevant chemical product supplier can install the correct setting.
8.3
Work prior to initial commissioning
It is paramount to comply with the instructions in this section prior to initial commissioning.
Water-carrying pipes
All pipes must be thoroughly flushed. The heating system must be switched off when
this is done (remove the fuses) in order to prevent the heating elements from operating
when the system is dry. Subsequently clean all dirt traps.
Steam pipes
All pipes must be thoroughly flushed. In this process, all control valves must be open
and all condensation traps must have been removed. Subsequently clean all dirt traps.
Electrical connection
Retighten all electrical terminals in the switch cabinet; check that electrical plug-in
connections are firmly seated.
Check all motors for correct sense of direction.
Carry out a visual check on all electrical equipment (e.g. switches, cables, hous-
ings, covers).
Carry out functional tests on all electrical switches.
Machine interior
Ensure that there are no foreign bodies inside the machine (e.g. cleaning rags, loose
bolts/washers/nuts, tools, packaging materials etc.).
Caution
Safeguard smooth transitions in areas where moving parts move
past fixed parts
(e.g. hoses.)
Make sure that all wash pipes, wash systems, final rinse arms, sieves, tank covers and
drain pipe as well as flaps have been connected to the input and output. Ensure that all the
parts are correctly installed!
9 Washing with the trolley washing machine
Once all installation work on the machine is complete and all settings have been entered
by
MEIKO installation engineers
, the machine can be commissioned.
10
Preparation for Operation
10.1
Basic safety measures during normal operation
The washing machine may only be operated by trained and authorized persons who are
familiar with the operating instructions and who are capable of working in accordance with
them!
Ensure the following before switching on the installation:
only authorised and trained persons are present in the installation’s operating area.
nobody could be injured by stetting the installation into operation.
Before commissioning, each time
inspect the washing machine for any visible damage and ensure that it is only operated
in perfect working condition!
Report any defects to the foreman immediately!
Remove any materials and/or objects that are not required for operation from the oper-
ating area!
check and ensure that all the safety equipment is operating perfectly!
CAUTION!