The Date/Time section shows a summary of the time and date of tests, and whether the tests
passed or failed. Clicking on a specific test date/time loads the test records for that event into the
main display area.
The spreadsheet style of the results view shows the actual test data acquired. The test date and
time are shown in the first two rows. A header row marks the start of a results section for each test
category followed by the specific test measurement results.
Color coding helps you see whether a test category includes all passing tests (green) or failing
results for specific measurements (red).
Figure 24. Example test results summary view.
The Surge, PI, and Step/Ramp Voltage test results can be viewed using the dedicated tabs found at
the bottom of the pane.
Basic Testing Procedures
For example, review the PI test by clicking on the
PI
tab. The PI view will display the PI/DA graph
along with a table of the current and megohm readings gathered at specific times. The PI voltage,
DA ratio, and PI ratio are displayed on the right side.
Baker AWA -IV Static Motor Analyzer
www.megger.com
24