Figure 16. Step-Voltage Configuration Wizard; adding steps.
SETTING UP A SURGE TEST
1. Click on the voltage button in the
Surge Test
section to enter the setup screen.
2. Using this screen, you can select options to use during testing, select parameters to include in
testing, and specify test parameter values.
3. Enter parameters based on IEEE, EPRI, EASA, IEC, or company standards.
4. Set Pass/Fail tolerances as needed for the motor under test.
5. You can also check the
ZS Override
button if you want the tester to automatically start at the
Surge Voltage
level, removing the need to ramp up and allowing the tester to reach the target
voltage faster. This feature is available only for semi- automatic or manual testing. Additionally,
the feature cannot be saved as part of a Test ID.
Preparing For Testing
6. The large graph area plots the surge waveform during testing.
7. The Run Surge controls are used during manual testing.
When using ZS (Zero Start) Override, test voltage will not start at
zero. Because the tester will immediately apply higher test voltages
to the motor, take all precautions to avoid injury or death from
severe electrical shock.