Software Description (Global UNT Interface Kit required to read or
change variables)
Variable
Name
Description
Default Value
Range
LPSS
Low Pressure Starting Setpoint
10 psi
5 to 15 psi
SLPT
Starting Low Pressure Time
260 sec
90 to 300 seconds
MLPS
Minimum Low Pressure Setpoint
5 psi
Calculated (LPSS-LPSD)
5 psi
LPSD
Low Pressure Starting Differential
5 psi
3 to 10 psi
LPFS
Low Pressure Freezestat setpoint
54 psi
30 to 55 psi
LPHL
Low Pressure High Limit
57 psi
40 to 60 psi
LPLL
Low Pressure Low Limit
55 psi
40 to 55 psi
FSTP
Freezestat Time Period
60 sec
60 seconds fixed
PDTD
Pumpdown Delay Time Period
60 sec
60 seconds fixed
Hot Gas Bypass (Optional)
This option allows the system to operate at low loads without the ON-OFF cycling of the compressor.
When the hot gas bypass option is used it is required to be on both refrigerant circuits because of the
lead / lag feature of the Global UNT controller.
This option allows passage of discharge gas into the evaporator inlet (between the TX valve and the
evaporator) which generates a false load to supplement the actual chilled water load.
Note:
The hot gas bypass valve cannot generate a 100% false load.
The valve that is supplied can provide a load of approximately 10 tons. The system load added to the
ten tons of the hot gas bypass valve has to exceed the compressor capacity for stage 1 compressor
operating unloaded for stable system operation. This requires some system load. When using hot gas
bypass, the optional six stage capacity staging unit is recommended.
A solenoid valve in the hot gas bypass lines is wired in parallel with both circuit’s liquid line solenoid
valves SV1 and SV2. The hot gas bypass is available whenever a refrigerant circuit is operating. The
hot gas valve is regulating by the evaporator pressure and the remote adjustable bulb. The pressure
regulating valve is factory set to begin opening at 58 psig (32°F for R-22). This setting can be
changed by adjusting the remote adjustable bulb. Remove the cap on the remote bulb and raise the
pressure by turning the adjustment screw clockwise. Lower the pressure by turning the adjusting
screw counterclockwise. This changes the pressure that the hot gas bypass valve will start to open.
Do not force the adjusting screw as this can damage the adjusting assembly.
NOTE: The hot gas line may become hot enough to cause injury. Be careful during valve
checkout.
NOTE:
The remote adjusting bulb must be installed on the outside of the suction line
insulation. The bulb has to have a stable ambient air temperature for proper operation.
Placing the bulb in contact with the evaporator refrigerant line will limit the operation of the
hot gas bypass valve.
Filter Driers
Each refrigerant circuit is furnished with a full flow filter drier or an optional replaceable core type
filter-drier. The core assembly of the replaceable core drier consists of a filter core held tightly in the
shell in a manner that allows full flow without bypass.
Pressure drop across the filter drier at full load conditions must not exceed 10 psig. If pressure drop
is more than 10 psig, then replace the filter drier.
NOTE: Pump out refrigerant before removing end flange for replacement of core(s).
A condenser liquid line service valve is provided for isolating the charge in the condenser, but also
serves as the point from which the liquid line can be pumped out. With the line free of liquid, the
filter-drier core(s) can be easily replaced.
Содержание AGR 070AS
Страница 20: ...20 AGR 070A through 100A IOMM AGR 1 Figure 9 Typical Field Wiring with Global UNT Controller...
Страница 21: ...IOMM AGR 1 AGR 070A through 100A 21 Figure 10 Typical Field Wiring Diagram with MicroTech Controller...
Страница 22: ...22 AGR 070A through 100A IOMM AGR 1 Figure 11 Standard Single Point Connection with FanTrol...
Страница 23: ...IOMM AGR 1 AGR 070A through 100A 23 Figure 12 Standard Single Point Connection with Optional SpeedTrol...
Страница 24: ...24 AGR 070A through 100A IOMM AGR 1 Figure 13 Unit Control Schematic 2 compressor UNT...
Страница 25: ...IOMM AGR 1 AGR 070A through 100A 25 Figure 14 Staging Schematic 2 compressor 4 stage UNT...
Страница 26: ...26 AGR 070A through 100A IOMM AGR 1 Figure 15 Staging Schematic 2 compressor 6 stage UNT...
Страница 27: ...IOMM AGR 1 AGR 070A through 100A 27 Figure 16 MicroTech Controller Schematic...
Страница 28: ...28 AGR 070A through 100A IOMM AGR 1 Figure 17 Unit Control Schematic MicroTech...
Страница 29: ...IOMM AGR 1 AGR 070A through 100A 29 Figure 18 Staging Schematic 4 stage MicroTech...
Страница 30: ...30 AGR 070A through 100A IOMM AGR 1 Figure 19 Staging Schematic 6 stage MicroTech...
Страница 31: ...IOMM AGR 1 AGR 070A through 100A 31 Figure 20 Unit Control Schematic 2 compressor MicroTech...
Страница 32: ...32 AGR 070A through 100A IOMM AGR 1 Figure 21 UNT Instrument Layout See legend on page 34...
Страница 33: ...IOMM AGR 1 AGR 070A through 100A 33 Figure 22 MicroTech Instrument Layout See legend on page 34...
Страница 35: ...IOMM AGR 1 AGR 070A through 100A 35 Figure 25 MicroTech Sensor Layout...
Страница 99: ...IOMM AGR 1 AGR 070A through 100A 99 Notes...
Страница 100: ...Post Office Box 2510 Staunton Virginia 24402 USA 800 432 1342 www mcquay com...