AGR Unit Operation
Sequence of Operation
Starting
With control power on, 115Vac power is applied through F1 to the compressor crankcase heaters and
control transformer T2. T2 supplies 24Vac to the Global UNT controller. The green light on the
Global UNT controller will begin to flash. The panel Alarm Light will illuminate. Put the System
Switch S1 into the AUTO position. This applies power to the control circuit and a digital input to the
Global UNT controller. Control power is applied through the MHP’s to the compressor inherent
motor protectors. After approximately a two (2) minute time delay, the MP’s are energized and the
panel Alarm Light will turn off. If this is a first start, depress the Freezestat Reset Button for 1
second. There is a default time delay of 5 minutes on the Freezestat reset.
Start the chiller water pump and put the chiller into the run mode by closing the remote start / stop
input or time clock input. After the flow switch has made, the Global UNT controller will begin to
ramp up if the chilled water temperature is above the leaving water setpoint dial plus 1/2 the control
band dial. Internal timing functions will vary the stage up time.
The refrigerant circuit starting is switched between circuits every ten (10) starts. This maintains equal
starts on the first compressor of each refrigerant circuit. Refrigerant circuit #1 is assumed as the
starting circuit for the following.
When the first stage of cooling is required, relay BO1 will be energized and if the evaporator pressure
is above the LPSS (low pressure starting setpoint), relay BO7 will be energized starting Compressor
#1 and energizing the liquid line solenoid valve (SV1) through control relay CCR1.
As additional cooling is required, relay BO2 will be energized and if the evaporator pressure is above
the LPSS (low pressure starting setpoint), relay BO8 will be energized starting Compressor #2 and
energizing the liquid line solenoid valve (SV2) through control relay CCR2.
As additional cooling is required, relays BO3 and BO4 will load compressors #1 and #2 respectively.
On six stage units, B05 and B06 will add additional load on the compressors.
The reverse will occur as the cooling requirements are reduced. Relays BO4 and BO3 will activate
unloading compressors #2 and #1. Relay BO2 will open closing the #2 refrigerant liquid line
solenoid valve. Compressor #2 will continue to operate until the LPLL (low pressure low limit) is
reached or the PDTD (pumpdown delay time period) timer times out. Relay BO8 will open stopping
compressor #2. Relay BO1 will open closing the #1 refrigerant liquid line solenoid valve.
Compressor #1 will continue to operate until the LPLL is reached or the PDTD timer times out.
Relay BO7 will open stopping compressor #1. The compressors will cycle on if the evaporator
pressure exceeds the LPSS setpoint. The Global Reciprocating Chiller has recycling pumpdown.
Standard Controller Setpoints (optional Zone Terminal required to
change values)
VALUES
TEMPLATE
NAME
FACTORY SETPOINT
RANGE
OA/AI3 Lim SP
80°F
0 to 100°F
OA/AI3 Reset SP
-40°F
-100 to 100°F
LvgWtr Rband SP
0°F
0 to 15°F
Unoccpd Lvg SP
70°F
40 to 90°F
OA Lockout SP
-10°F
-20 to 65°F
Lvg Low Lim SP
20°F
20 to 40°F
SoftSta Capcty
50%
0 to 100%
SoftStart Time
2 min
0 to 20 minutes
Содержание AGR 070AS
Страница 20: ...20 AGR 070A through 100A IOMM AGR 1 Figure 9 Typical Field Wiring with Global UNT Controller...
Страница 21: ...IOMM AGR 1 AGR 070A through 100A 21 Figure 10 Typical Field Wiring Diagram with MicroTech Controller...
Страница 22: ...22 AGR 070A through 100A IOMM AGR 1 Figure 11 Standard Single Point Connection with FanTrol...
Страница 23: ...IOMM AGR 1 AGR 070A through 100A 23 Figure 12 Standard Single Point Connection with Optional SpeedTrol...
Страница 24: ...24 AGR 070A through 100A IOMM AGR 1 Figure 13 Unit Control Schematic 2 compressor UNT...
Страница 25: ...IOMM AGR 1 AGR 070A through 100A 25 Figure 14 Staging Schematic 2 compressor 4 stage UNT...
Страница 26: ...26 AGR 070A through 100A IOMM AGR 1 Figure 15 Staging Schematic 2 compressor 6 stage UNT...
Страница 27: ...IOMM AGR 1 AGR 070A through 100A 27 Figure 16 MicroTech Controller Schematic...
Страница 28: ...28 AGR 070A through 100A IOMM AGR 1 Figure 17 Unit Control Schematic MicroTech...
Страница 29: ...IOMM AGR 1 AGR 070A through 100A 29 Figure 18 Staging Schematic 4 stage MicroTech...
Страница 30: ...30 AGR 070A through 100A IOMM AGR 1 Figure 19 Staging Schematic 6 stage MicroTech...
Страница 31: ...IOMM AGR 1 AGR 070A through 100A 31 Figure 20 Unit Control Schematic 2 compressor MicroTech...
Страница 32: ...32 AGR 070A through 100A IOMM AGR 1 Figure 21 UNT Instrument Layout See legend on page 34...
Страница 33: ...IOMM AGR 1 AGR 070A through 100A 33 Figure 22 MicroTech Instrument Layout See legend on page 34...
Страница 35: ...IOMM AGR 1 AGR 070A through 100A 35 Figure 25 MicroTech Sensor Layout...
Страница 99: ...IOMM AGR 1 AGR 070A through 100A 99 Notes...
Страница 100: ...Post Office Box 2510 Staunton Virginia 24402 USA 800 432 1342 www mcquay com...