Start-Up
There should be adequate building load (25% of unit capacity minimum) to properly check the
operation of the chiller refrigerant circuits.
Be prepared to record all operating parameters required by the “Compressorized Equipment Warranty
Form”. Return this information within 10 working days to McQuay International as instructed on the
form to obtain full warranty benefits.
1.
Verify chilled water flow.
2.
Verify remote start / stop or time clock has requested the chiller to start.
3.
Set the chilled water setpoint to required temperature. (The system water temperature must be
greater than the total of the leaving water temperature setpoint plus 1/2 the control band before
the Global UNT controller will stage on cooling.)
4.
Set the control band to 4°F as a starting point.
5.
Put both circuit switches to the AUTO position.
6.
Put switch S1 to AUTO position.
7.
There will be a delay of 2 minutes after closing S1. The time delay is due to the compressor
inherent motor protection. This may allow more than one compressor to start after this time
period. This should only occur on initial start-up or when power to the chiller has been turned off
and back on. The panel Alarm Light will turn off.
8.
After operating for a period of time and unit has become stable, check the following:
Compressor oil level.
Refrigerant sight glass for flashing.
Rotation of condenser fans.
Shutdown
Temporary
1.
Put both circuit switches to Pumpdown and Stop.
2.
After compressors have stopped, put System Switch (S1) to Emergency Stop.
3.
Turn off chilled water pump. Chilled water pump to operate during pumpdown.
To start the chiller after a temporary shutdown follow the start up instructions.
Extended
1.
Front seat both condenser liquid line service valves.
2.
Put both circuit switches in Pumpdown and Stop position.
3.
After the compressors have stopped, put System Switch (S1) in Emergency Stop position.
4.
Front seat both refrigerant circuit discharge valves.
5.
If chilled water system is not drained, maintain power to the evaporator heater to prevent
freezing. Maintain heat tracing on the chilled water lines.
6.
Drain evaporator and water piping to prevent freezing.
7.
If electrical power is on to unit, the compressor crankcase heaters will keep the liquid refrigerant
out of the compressor oil. This will minimize start up time when putting the unit back into
service. The evaporator heater will be able to function.
8.
If electrical power is off, make provisions to power the evaporator heater (if chilled water system
is not drained). Tag all opened electrical disconnect switches to warm against startup before the
refrigerant valves are in the correct operating position. When starting the unit, electrical power
must be on for 24 hours before starting the chiller.
To start the chiller after an extended shutdown, follow the pre startup and startup instructions.
Содержание AGR 070AS
Страница 20: ...20 AGR 070A through 100A IOMM AGR 1 Figure 9 Typical Field Wiring with Global UNT Controller...
Страница 21: ...IOMM AGR 1 AGR 070A through 100A 21 Figure 10 Typical Field Wiring Diagram with MicroTech Controller...
Страница 22: ...22 AGR 070A through 100A IOMM AGR 1 Figure 11 Standard Single Point Connection with FanTrol...
Страница 23: ...IOMM AGR 1 AGR 070A through 100A 23 Figure 12 Standard Single Point Connection with Optional SpeedTrol...
Страница 24: ...24 AGR 070A through 100A IOMM AGR 1 Figure 13 Unit Control Schematic 2 compressor UNT...
Страница 25: ...IOMM AGR 1 AGR 070A through 100A 25 Figure 14 Staging Schematic 2 compressor 4 stage UNT...
Страница 26: ...26 AGR 070A through 100A IOMM AGR 1 Figure 15 Staging Schematic 2 compressor 6 stage UNT...
Страница 27: ...IOMM AGR 1 AGR 070A through 100A 27 Figure 16 MicroTech Controller Schematic...
Страница 28: ...28 AGR 070A through 100A IOMM AGR 1 Figure 17 Unit Control Schematic MicroTech...
Страница 29: ...IOMM AGR 1 AGR 070A through 100A 29 Figure 18 Staging Schematic 4 stage MicroTech...
Страница 30: ...30 AGR 070A through 100A IOMM AGR 1 Figure 19 Staging Schematic 6 stage MicroTech...
Страница 31: ...IOMM AGR 1 AGR 070A through 100A 31 Figure 20 Unit Control Schematic 2 compressor MicroTech...
Страница 32: ...32 AGR 070A through 100A IOMM AGR 1 Figure 21 UNT Instrument Layout See legend on page 34...
Страница 33: ...IOMM AGR 1 AGR 070A through 100A 33 Figure 22 MicroTech Instrument Layout See legend on page 34...
Страница 35: ...IOMM AGR 1 AGR 070A through 100A 35 Figure 25 MicroTech Sensor Layout...
Страница 99: ...IOMM AGR 1 AGR 070A through 100A 99 Notes...
Страница 100: ...Post Office Box 2510 Staunton Virginia 24402 USA 800 432 1342 www mcquay com...