IOMM ACZ/AGZ-1
Operation
Sequence of Operation
Starting
With control power on, 115Vac power is applied through F1 to the compressor crankcase heaters and
control transformer T2. T2 supplies 24Vac to the Global UNT controller. The green light on the Global
UNT controller will begin to flash. The panel Alarm Light will illuminate. Put the System Switch S1
into the AUTO position. This applies power to the control circuit and a digital input to the Global
UNT controller. Control power is applied through the MHP’s to the compressor inherent motor
protectors. After approximately a two (2) minute time delay, the MP’s are energized and the panel
Alarm Light will turn off. If this is a first start, depress the Freezestat Reset Button for 1 seconds.
There is a default time delay of 5 minutes on the Freezestat reset.
Start the chiller water pump and put the chiller into the run mode by closing the remote start / stop
input or time clock input. After the flow switch has made, the Global UNT controller will begin to ramp
up if the chilled water temperature is above the leaving water setpoint dial plus 1/2 the control band
dial. Internal timing functions will vary the stage up time.
The refrigerant circuit starting is switched between circuits every ten (10) starts. This maintains equal
starts on the first compressor of each refrigerant circuit. Refrigerant circuit #1 is assumed as the
starting circuit for the following.
When the first stage of cooling is required, relay BO1 will be energized and if the evaporator pressure
is above the LPSS (low pressure starting setpoint), relay BO7 will be energized starting Compressor #1
and energizing the liquid line solenoid valve (SV1) through control relay CCR1.
As additional cooling is required, relay BO2 will be energized and if the evaporator pressure is above
the LPSS (low pressure starting setpoint), relay BO8 will be energized starting Compressor #2 and
energizing the liquid line solenoid valve (SV2) through control relay CCR2.
As additional cooling is required, relays BO3 and BO4 will start compressor #3 and #4 respectively.
The reverse will occur as the cooling requirements are reduced. Relays BO4 and BO3 will open
stopping compressors #4 and #3. Relay BO2 will open closing the #2 refrigerant liquid line solenoid
valve. Compressor #2 will continue to operate until the LPLL (low pressure low limit) is reached or the
PDTD (pumpdown delay time period) timer times out. Relay BO8 will open stopping compressor #2.
Relay BO1 will open closing the #1 refrigerant liquid line solenoid valve. Compressor #1 will continue
to operate until the LPLL is reached or the PDTD timer times out. Relay BO7 will open stopping
compressor #1. The compressors will not cycle on if the evaporator pressure exceeds the LPSS
setpoint. The Global Scroll Chiller has a one time pumpdown.
Standard Controller Setpoints (optional Zone Terminal required to
change values)
VALUES
TEMPLATE
NAME
FACTORY SETPOINT
RANGE
OA/AI3 Lim SP
80°F
0 to 100°F
OA/AI3 Reset SP
-40°F
-100 to 100°F
LvgWtr Rband SP
0°F
0 to 15°F
Unoccpd Lvg SP
70°F
40 to 90°F
OA Lockout SP
-10°F
-20 to 65°F
Lvg Low Lim SP
20°F
20 to 40°F
SoftSta Capcty
50%
0 to 100%
SoftStart Time
2 min
0 to 20 minutes
Содержание ACZ 045A
Страница 6: ...6 IOMM ACZ AGZ 1 Figure 3 Clearance Requirements...
Страница 27: ...IOMM ACZ AGZ 1 27 Figure 12 AGZ AM Single point Connection with FanTrol...
Страница 28: ...28 IOMM ACZ AGZ 1 Figure 13 AGZ AM Single point Connection with SpeedTrol...
Страница 29: ...IOMM ACZ AGZ 1 29 Figure 14 AGZ AM Unit Control Schematic UNT...
Страница 30: ...30 IOMM ACZ AGZ 1 Figure 15 AGZ AM Staging Schematic UNT...
Страница 31: ...IOMM ACZ AGZ 1 31 Figure 16 AGZ AM MicroTech Controller Schematic...
Страница 32: ...32 IOMM ACZ AGZ 1 Figure 17 AGZ AM Unit Control Schematic MicroTech...
Страница 33: ...IOMM ACZ AGZ 1 33 Figure 18 AGZ AM Staging Schematic MicroTech...
Страница 34: ...34 IOMM ACZ AGZ 1 Figure 19 ACZ Field Connection Diagram No Capacity Control...
Страница 35: ...IOMM ACZ AGZ 1 35 Figure 20 ACZ Field Wiring Diagram Capacity Control Staging...
Страница 104: ...Post Office Box 2510 Staunton Virginia 24402 2510 USA 800 432 1342 www mcquay com...