![Markes International Unity 2 Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/markes-international/unity-2/unity-2_user-manual_1727982012.webp)
QUI-1057
Page 12
Markes International Ltd
T:
+44 (0)1443 230935
F:
+44 (0)1443 231531
E:
www.markes.com
2.2
Sequence of operation
When a tube is placed and sealed into the flow path of UNITY 2 for conventional 2(3) stage desorption, it
undergoes the following sequence of operations: standby, leak test, prepurge, primary desorption, pre trap
fire purge and secondary desorption.
2.2.1
Standby
Sam
p
le
T
ube
S
pli
t
T
ube
C
o
ld
Tr
ap
GC
Heated Valve
STANDBY
Pressure and flow
Pressure (flow optional)
Pressure, no flow
KEY