
Rigging work
12.10 Rigging work on the main boom
12 - 122
3 302 690 en
Operating manual
GMK4100L-1
2
3
.1
1.
201
7
Attaching the lifting limit switch weight
•
Attach the lifting limit switch weight (
1
).
These lifting limit switches must not be
blocked;
If two hoist ropes are reeved, you must attach
a lifting limit switch weight to each of the two
lifting limit switches.
Placing a lifting limit switch weight around
the hoist rope
•
(
A
) – Pull the safety pin (
1
) out and fold the
two halves of the weight apart.
•
(
B
) – Place the two halves of the weight
around the last rope line leading upwards.
•
Pull the safety pin (
1
) out and fold the two
halves of the weight back together.
•
Make sure the safety pin locks into place and
the two halves of the weight are securely
attached to each other.
If two hoist ropes are reeved, you must also
place a lifting limit switch weight around the
second hoist rope.
H
If you place the lifting limit switch weight around the last rope line leading
upwards, less rope will run through the lifting limit switch weight, especially
if there is a high number of reevings per lifting operation. This rope line will
even be at a standstill if the number of rope lines is even.
This allows you to reduce the wear of the hoist rope and lifting limit switch
weight and prevent unintentional deactivation procedures that may be
caused by the running hoist rope lifting the lifting limit switch weight.
Содержание Grove GMK 4100L-1
Страница 1: ...Operating manual 3 302 690 en 23 11 2017 ...
Страница 6: ...16 01 2018 2 3 302 710 en Additional pages GMK4100L 1 Overview of Driving menu I ...
Страница 8: ...16 01 2018 4 3 302 710 en Additional pages GMK4100L 1 Blank page ...
Страница 36: ...3 302 690 en Operating manual GMK4100L 1 23 11 2017 ...
Страница 38: ...3 302 690 en Operating manual GMK4100L 1 23 11 2017 ...
Страница 40: ...3 302 690 en Operating manual GMK4100L 1 23 11 2017 ...
Страница 44: ...3 302 690 en Operating manual GMK4100L 1 23 11 2017 ...
Страница 48: ...3 302 690 en Operating manual GMK4100L 1 23 11 2017 ...
Страница 50: ...3 302 690 en Operating manual GMK4100L 1 23 11 2017 ...
Страница 52: ...3 302 690 en Operating manual GMK4100L 1 23 11 2017 ...
Страница 56: ...3 302 690 en Operating manual GMK4100L 1 23 11 2017 ...
Страница 62: ...3 302 690 en Operating manual GMK4100L 1 23 11 2017 ...
Страница 65: ...Operating manual 3 302 690 en GMK4100L 1 23 11 2017 15 15 Index ...
Страница 66: ...3 302 690 en Operating manual GMK4100L 1 23 11 2017 ...
Страница 68: ...Overview 1 1 Accidents 1 2 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 70: ...Overview 1 4 Terms used 1 4 3 302 690 en Operating manual GMK4100L 1 23 11 2017 1 4 Terms used ...
Страница 72: ...Overview 1 4 Terms used 1 6 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 100: ...Overview 1 10 Identification 1 34 3 302 690 en Operating manual GMK4100L 1 23 11 2017 1 10 Identification ...
Страница 226: ...Driving 5 1 Before driving 5 12 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 308: ...Driving modes 6 1 Driving modes 6 8 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 328: ...Driving modes 6 4 Rigging the auxiliary hoist 6 28 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 608: ...Crane operation 11 1 Before operating the crane 11 20 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 610: ...Crane operation 11 2 Standard slewing range type 11 22 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 736: ...Crane operation 11 7 Working range limiter 11 148 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 774: ...Rigging work 12 5 Starting the engine for rigging 12 28 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 798: ...Rigging work 12 8 Outrigger operation 12 52 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 814: ...Rigging work 12 8 Outrigger operation 12 68 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 884: ...Rigging work 12 11 Other rigging work 12 138 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 996: ...Index 15 2 3 302 690 en Operating manual GMK4100L 1 23 11 2017 Blank page ...
Страница 1014: ...Index Operating manual 3 302 690 en 15 20 GMK4100L 1 23 11 2017 Blank page ...
Страница 1015: ......
Страница 1016: ......