S12800 Routing Switch Installa
tion Manual V1.0
Maipu Confidential & Proprietary Information
Page 28
Step 2:
Install the floating nuts at the marked position (Each installation hole on the
mounting ear should be installed with one floating nut), as shown in Figure 3-5.
Figure 3-5 Install the floating nut
1. Floating nut
2. Square hole post
3.1.5 Install Device to Cabinet
Before installing the device to the cabinet, ensure that the corresponding positions on the
cabinet are installed with the pallet and the pallet can support the weight of the device and
its accessories.
The following describes the installation process of installing the device to the cabinet.
Step 1:
Uplift the chassis from the packaging pallet. When uplifting the chassis, need
four persons to use the hands to hold the handles at the left and right sides of
the chassis. Except for the four handles at the two sides of the chassis, the
other parts cannot bear the weight, as shown in Figure 3-6.
Figure 3-6 Uplift the chassis