Section 6 - Wiring (Continued)
44
TABLE 2(E) TR12 2-SPEED PROGRAMMING DIAGRAM.
P&H: 2-SPEED, 2-WINDINGS for HOIST and TROLLEY;
STANDARD BRIDGE
MOTOR 1 CONNECTIONS
MOTOR 2 CONNECTIONS MOTOR
3 CONNECTIONS
J4-3
HOIST
UP
J3-3
TROLLEY
DIR 1
J2-3
BRIDGE
DIR 1
J4-2
HOIST
1
ST
SPEED
J3-2
TROLLEY
1
ST
SPEED
J2-2
BRIDGE
2
ND
SPEED
J4-1
HOIST
DOWN
J3-1
TROLLEY
DIR 2
J2-1
BRIDGE
DIR 2
J4-4 HOT (J4-1, 2 & 3)
J3-4 HOT (J3-1, 2 & 3)
J2-4 HOT (J2-1, 2 & 3)
J5-6
HOIST
2
ND
SPEED
J5-4
TROLLEY
2
ND
SPEED
J5-5 HOT
HOIST
2
ND
SPEED
J5-3 HOT
TROLLEY
2
ND
SPEED
INDEPENDENT CONNECTIONS
J5-2 AUX 1 (LATCHABLE S4-2)
J5-1 HOT AUX 1
TRANSMITTER SWITCH SETTINGS
telePilot
USE PDA SCREEN (Program the configuration switches 5, 6 & 7 to match the settings shown below).
MEMBRANE USE SW3 “C”
PENDANT, JLTX AND SLTX USE SW4 “D”
TRANSMITTER SWITCH SETTINGS:
Position-5
Position -6
Position -7
OFF
OFF
ON
*NOTE: Hoist, Trolley and Bridge are listed here as traditional configurations, the installer may choose to define the
motors differently.
OFF
1 2 3 4 5 6 7 8
ON
For these switch
positions see
previous section.
Indicates Switch in OFF Position.
OUTPUTS
J2-3
J2-2
J2-1
BRIDGE
*
MOTOR 3
1
ST
2
ND
Dir 1 Dir 2
OUTPUTS
J4-3
J4-2
J4-1
HOIST*
MOTOR 1
1
ST
2
ND
UP DN
2
ND
1
ST
2
ND
1
ST
OUTPUTS
J3-3
J3-2
J3-1
TROLLEY*
MOTOR 2
1
ST
2
ND
Dir 1 Dir 2
2
ND
1
ST
J5-6
J5-4
J5-2
AUX 1
INDEPENDENT OUTPUTS