
3 - 17
(2) SCR inducement strategy – General inducement strategy
General items
Vehicle reach final inducement after 4 hours of operation after failure detection.
Three full power restarts (validation restarts for healing) part of 4 hours time frame.
Validation restarts
- Validation restarts allowed any time after detection.
- Validation restarts are key cycle locked to avoid unintended activation.
- Limited to 30 minutes each.
- After expiring of the 30 minutes is the engine immediately ramped down to final inducement.
- Validation restart is available only for failures that need heated up after treatment system or
active dosing – not for electrical failures, DEF quality or DEF level.
Repeated offenders: after 3 failure detections within 40 hours inducement locked
Failures can be reset only with a dealership tool
- SCR inducement failures.
- Reset of repeated offenders time & event counter.
Содержание MT7101
Страница 1: ...LS TRACTOR OPERATOR S MANUAL MT784 MT794 MT7101...
Страница 2: ......
Страница 4: ......
Страница 56: ...1 46...
Страница 70: ...2 14...
Страница 88: ...3 18 SCR inducement strategy Low DEF level...
Страница 89: ...3 19 SCR inducement strategy poor DEF quality...
Страница 90: ...3 20 SCR inducement strategy SCR System tampering detection...
Страница 188: ...4 36 Attaching points for Front end loader When attaching the front end loader refer to the drawings as below Unit mm...
Страница 198: ...4 46...
Страница 201: ...5 3 Identification markings Metric hex bolt head 1 Manufacturer s identification 2 Property class GS 8 8 1 2...
Страница 271: ...5 73 Attachment...
Страница 272: ...5 74...
Страница 284: ...7 4...
Страница 285: ...8 1 8 Dimension and Specification 1 Cabin type Unit mm When applying front tire 12 4 24 8PR rear tire 16 9 34 8PR...
Страница 286: ...8 2 2 Roll bar type Unit mm When applying front tire 12 4 24 8PR rear tire 16 9 34 8PR...
Страница 291: ......
Страница 292: ......