
4 - 24
③
Attaching power take-off(PTO) drive shaft
When connecting PTO drive shaft to the PTO shaft and implement, make sure to check that the
locking pin of the PTO drive shaft is locked in place.
When attaching PTO drive shaft, refer to the drawings as below for safety clearance zone.
After installing implement(s), check the followings according to the position of the 3-point linkage.
- check the articulation angle of the PTO drive shaft and rotating noise is suitable.
- check the interference with PTO safety cover and other structure.
- check the effective engaging length of the PTO drive shaft.
- check the working position of the automatic PTO ON/OFF device. (if fitted)
▶
The steep inclination of the PTO drive shaft makes a loud noise and cause a
failure of the PTO driveline. When working in the field, do not lift up the rear
implement over the manufacture’s limitation
that the maximum articulation angle
of the PTO drive shaft is 18 degree when the PTO drive shaft is rotating.
Caution
Содержание MT7101
Страница 1: ...LS TRACTOR OPERATOR S MANUAL MT784 MT794 MT7101...
Страница 2: ......
Страница 4: ......
Страница 56: ...1 46...
Страница 70: ...2 14...
Страница 88: ...3 18 SCR inducement strategy Low DEF level...
Страница 89: ...3 19 SCR inducement strategy poor DEF quality...
Страница 90: ...3 20 SCR inducement strategy SCR System tampering detection...
Страница 188: ...4 36 Attaching points for Front end loader When attaching the front end loader refer to the drawings as below Unit mm...
Страница 198: ...4 46...
Страница 201: ...5 3 Identification markings Metric hex bolt head 1 Manufacturer s identification 2 Property class GS 8 8 1 2...
Страница 271: ...5 73 Attachment...
Страница 272: ...5 74...
Страница 284: ...7 4...
Страница 285: ...8 1 8 Dimension and Specification 1 Cabin type Unit mm When applying front tire 12 4 24 8PR rear tire 16 9 34 8PR...
Страница 286: ...8 2 2 Roll bar type Unit mm When applying front tire 12 4 24 8PR rear tire 16 9 34 8PR...
Страница 291: ......
Страница 292: ......