Operator's Manual No. 1/2015 "Alulift type Mobile Elevating Work Platform"
August 2015 Page 29
transferring external forces acting on the PRP. PRP anchoring must be carried out on an ongoing
basis while erecting the structure. Anchoring fasteners are used for anchoring the PRP. The
fasteners hooks should be combined with screw-eye bolts driven in the wall plugs embedded in
the wall.
Anchoring should start at the height of 4 m.
Anchoring bolts should be attached to the frame one anchor per side and placed symmetrically
on the entire surface. The distance between anchors in the vertical direction should not exceed 4
m. The distance between the PRP and the wall should be suitable to the nature of work in a way
that allows you to safely perform it on the work platform. The anchors should be parallel in
relation to the frames on the outside of the structure during bolting special attention must be
paid so that the anchor bolt would not fall within the outline of the mobile work platform.
Drawing 5 An anchor installed at the platform - Reference drawing
Table 4 Distribution of the anchors
PRP height Number of anchors Anchoring on frame number
1 m
0
0
2 m
0
0
3 m
0
0
4 m
2
4
5 m
2
4
6 m
2
4
7 m
2
4
8 m
4
4 and 8
9 m
4
4 and 8
10 m
4
4 and 8
11 m
4
4 and 8
12 m
6
4, 8 and 12
It is prohibited to apply PRP anchoring to gutters, lightning conductors or
window frames.
5.4.
Disassembly
In order to start the disassembly, lift the platform to the height of the penultimate
segment of the base frame.
Remove the two diagonal braces connecting the PRP base frames from the highest level
You can only remove the braces from the last segment to be disassembled